100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

NFPA 99 Practice Test 2025 with Correct Questions and Answers – Medical Gas Systems

Puntuación
-
Vendido
-
Páginas
33
Grado
A
Subido en
12-10-2025
Escrito en
2025/2026

Download the NFPA 99 Practice Test 2025 with verified correct answers. Covers medical gas systems, alarm panels, oxygen piping, bulk gas storage, brazing, safety codes, and installation requirements for ASSE 6010 and healthcare compliance.

Mostrar más Leer menos
Institución
Nfpa
Grado
Nfpa











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Nfpa
Grado
Nfpa

Información del documento

Subido en
12 de octubre de 2025
Número de páginas
33
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

NFPA-99: PRACTICE TEST QUESTIONS
EXAM WITH CORRECT QUESTIONS
AND ANSWERS 2025

Under which of these conditions shall the instrument Air Reserve header cylinders be permitted


to be stored with the instrument air compressor?


A) the mechanical equipment room does not contain a boiler.


B) the medical air compressors are in the same room.


C) the only motor-driven machinery in the room is for instrument air equipment.


D) the room is secured with lockable doors. - CORRECT-ANSWERSC) The only motor-driven


machinery in the room is for the instrument air equipment


Riser valves are those valves located where?


A) adjacent to the main riser downstream of any zone valve.


B) anywhere in the lateral branches of the piping system.


C) in the mainline adjacent to the base of the riser.


D) in the riser adjacent to the mainline. - CORRECT-ANSWERSD) In the riser adjacent to the


main line


When is the initial pressure test conducted by the installer?

,A) after blowdown of the distribution piping.


B) after installation of alarm sensors.


C) before blowdown of distribution piping.


D) before installation of station rough in assembly. - CORRECT-ANSWERSA) After blow-down of


the distribution piping.


In those portions of systems intended to handle oxygen at pressure greater than 350 psi the


inter connecting hose shall not contain what materials?


A) brass.


B) copper


C) polymeric


D) stainless steel - CORRECT-ANSWERSC) Polymeric


The tool shown here allows the installer to mechanically limit the makeup depth of the fitting


to be brazed. Under what condition is this method permitted for the installation of medical gas


piping?


A) only on final line connectors.


B) only on vacuum systems.


C) where only B cup 5 brazing rod is used

,D) where the limited makeup depth is not less than minimum cut depth her ANSI / ASME


recommendations - CORRECT-ANSWERSD) Where the limited makeup depth is not less than


minimum cup depth current ANSI\ASME recommendation


What is the standard gauge pressure for nitrogen gas service?


A) 15 - 30


B) 50 - 55


C) 162 185


D) it varies with system type. - CORRECT-ANSWERSC) 50 - 55 psi


What is a NFPA 99 requirement for labeling of pipes in medical gas system?


A) color coding


B) fixed label with


C) label shall wrap completely around pipe.


D) reflective label - CORRECT-ANSWERSA) Color coding


A wireless communication device is employed in a medical gas or vacuum warning system. what


type of supervision is required for this device?


A) a visual indicator Shelby located in maintenance officer or engineering department.


B) this device shall be installed at the medical gas or vacuum source.


C) this device shall be located at nurses station.

, D) this device will be supervised such that failure communication shall initiate an alarm. -


CORRECT-ANSWERSD) This device will be supervised such that failure of communication shall


initate an alarm


In a facility where Medical Gas vacuum systems are present and the failure of such equipment


or systems is likely to cause any major injury or death to patients or caregivers this system shall


be designed to meet which category requirements?


A) 1


B) 2


C) 3


D) 4 - CORRECT-ANSWERSA) category 1


A faculty is in the planning stages of installing an emergency oxygen service connection (ESOC).


How many feet is the minimum amount of clearance required around this connection?


A) 1 foot


B) 3 feet


C) 5 feet


D) Clearance must be 1-1/2 times the width of the auxiliary. - CORRECT-ANSWERSB) 3 feet


Wooden rack for cylinder storage may be permitted under which conditions?


A) the wooden must be painted.
$13.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
frosty3

Conoce al vendedor

Seller avatar
frosty3 Howard Community College
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
Nuevo en Stuvia
Miembro desde
2 meses
Número de seguidores
1
Documentos
57
Última venta
-

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes