CQM 6.4 Exam with verified detailed answers ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Importance of Testing - correct answer✔✔If tests are not performed properly, there are ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
many construction procedures and materials that cannot be confirmed as adequate. Visual
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
observation alone is ||\\//|| ||\\//|| ||\\//||
insufficient.
Types of Tests - correct answer✔✔The contractor performs quality control (QC) testing to
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
determine whether construction procedures and materials are producing the desired ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
contractual product. ||\\//||
Procedures - correct answer✔✔The contractor must outline proposed "testing procedures" ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
as defined in Section 01 45 00.00 10 and/or Section 01 45 00.00 20 in the QC Plan. These
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
proposed procedures must be discussed at the Coordination Meeting or the Mutual ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Understanding Meeting. ||\\//||
The contractor must provide a list of required control tests and specify whether
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
the tests are to be performed by an independent, approved testing laboratory, or
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
using their own personnel and facilities. ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Regardless of which method of testing the contractor uses, they are required to ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
assure that specified laboratory procedures are used and that laboratory facilities
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
are certified. ||\\//||
QA tests - correct answer✔✔are unannounced sporadic tests that repeat QC tests. QA
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
testing can be performed ||\\//|| ||\\//|| ||\\//|| ||\\//||
by: ||\\//||
• Government personnel using the contractor's equipment and facilities,
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
• An independent testing laboratory, or
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Importance of Testing - correct answer✔✔If tests are not performed properly, there are ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
many construction procedures and materials that cannot be confirmed as adequate. Visual
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
observation alone is ||\\//|| ||\\//|| ||\\//||
insufficient.
Types of Tests - correct answer✔✔The contractor performs quality control (QC) testing to
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
determine whether construction procedures and materials are producing the desired ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
contractual product. ||\\//||
Procedures - correct answer✔✔The contractor must outline proposed "testing procedures" ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
as defined in Section 01 45 00.00 10 and/or Section 01 45 00.00 20 in the QC Plan. These
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
proposed procedures must be discussed at the Coordination Meeting or the Mutual ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Understanding Meeting. ||\\//||
The contractor must provide a list of required control tests and specify whether
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
the tests are to be performed by an independent, approved testing laboratory, or
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
using their own personnel and facilities. ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Regardless of which method of testing the contractor uses, they are required to ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
assure that specified laboratory procedures are used and that laboratory facilities
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
are certified. ||\\//||
QA tests - correct answer✔✔are unannounced sporadic tests that repeat QC tests. QA
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
testing can be performed ||\\//|| ||\\//|| ||\\//|| ||\\//||
by: ||\\//||
• Government personnel using the contractor's equipment and facilities,
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
• An independent testing laboratory, or
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||