Solutions
Save
Terms in this set (53)
Facility walk through B Functional test of the line leak detectors
inspections include all
except the following:
A Functional test of
audible and visual alarms
B Functional test of the
line leak detectors
C Inspection of the
impressed current
cathodic protection
system (if present)
D Inspection of spill
response equipment
Prior to receiving a A Calculate the available space in the tank taking
delivery, you should ----- the overfill limit
-
A Calculate the available
space in the tank taking
the overfill limit
B Contact the driver to
determine the scheduled
time of the delivery
C Close your station to
prepare for the delivery
D Calculate the available
space in the tank based
on the tank's maximum
capacity
,Spill buckets must be B Every year
tested _
A Every 3 years
B Every year
CEvery other year
D Only during secondary
containment testing
Secondary containment A Is not required
testing for UST Systems
monitored by one of
these continuous (vapor,
pressure, hazardous
substance) methods:
A Is not required
B Must be conducted
every other year
C Must be conducted
every three years
D Must be conducted
annually
Underground storage B Double-walled and product tight, meaning no
tank systems installed liquid or vapor can escape from system
after july 1 2003 must be
A Product tight, meaning
no liquid or vapor can
escape from the system
B Double-walled and
product tight, meaning
no liquid or vapor can
escape from system
C Monitored by a
continuous (vapor,
pressure, hazardous
substance) method
D Constructed of steel
with an outer and inner
fiberglass coating
, Underground storage Double-walled and continuous monitored {vapor.
tank systems installed pressure. hazardous)
after July 1, 2004, must be
Product tight, meaning
no liquid or vapor can
escape from the system
Double-walled and
product tight, meaning
no liquid or vapor can
escape from system
Monitored by a
continuous (vapor,
pressure, hazardous
substance) method
Double-walled and
continuous monitored
{vapor. pressure.
hazardous)
All _________ must be Pressurized piping
equipped with an
automatic line leak
detectors
SIR results are required Annually
to be reported to the
local agency ____________