MDFR TEST 18 EXAM WITH CORRECT
QUESTIONS AND ANSWERS 2025
What can the pre-plan provide clues to? - CORRECT-ANSWERSWhere and when a building
may fall
We must remain oriented to the building at all times in case conditions deteriorate! -
CORRECT-ANSWERSTrue
What tools do we need? ( 9 items ) - CORRECT-ANSWERS- compliment of irons
- Radio
- Flashlight
- webbing
- Carabiner
- personal rope bag
- channel locks
, - multi screwdriver
- Wire cutters
What should be weight rating for webbing? - CORRECT-ANSWERS4000 lbs
How many carabiners and what weight rating should they be? - CORRECT-
ANSWERSMinimum of 2, 9000 lb weight rating
What should be tensile strength of personal rope bag? - CORRECT-ANSWERS2875 lbs
What is size up? - CORRECT-ANSWERSSystematic process of gathering info to evaluate
situation at hand, transfer evaluation into a plan
What are 4 components of size up? - CORRECT-ANSWERS- construction
- location/ extent of fire
- occupancy
- life hazard
For a 360 view who can we assign? - CORRECT-ANSWERSOurselves or someone else
QUESTIONS AND ANSWERS 2025
What can the pre-plan provide clues to? - CORRECT-ANSWERSWhere and when a building
may fall
We must remain oriented to the building at all times in case conditions deteriorate! -
CORRECT-ANSWERSTrue
What tools do we need? ( 9 items ) - CORRECT-ANSWERS- compliment of irons
- Radio
- Flashlight
- webbing
- Carabiner
- personal rope bag
- channel locks
, - multi screwdriver
- Wire cutters
What should be weight rating for webbing? - CORRECT-ANSWERS4000 lbs
How many carabiners and what weight rating should they be? - CORRECT-
ANSWERSMinimum of 2, 9000 lb weight rating
What should be tensile strength of personal rope bag? - CORRECT-ANSWERS2875 lbs
What is size up? - CORRECT-ANSWERSSystematic process of gathering info to evaluate
situation at hand, transfer evaluation into a plan
What are 4 components of size up? - CORRECT-ANSWERS- construction
- location/ extent of fire
- occupancy
- life hazard
For a 360 view who can we assign? - CORRECT-ANSWERSOurselves or someone else