SKYWEST ERJ 175 SYSTEMS EXAM (ACTUAL 2025/2026) QUESTIONS WITH 100% VERIFIED CORRECT ANSWERS. What is the minimum battery voltage for normal ops? 22.5V When is it appropriate to start the APU in conjunction with the after landing sequence when flying for united or alaska/ When ground power not available at the gate and when nearing the gate What kind of checklist is the Safety and Power Up? Captain or FO Read And Do checklist what consideration must be given to shutting down an engine after the 2-min cool down period? Ensure it's not shutdown while turning the aircraft Why would shutting down the right engine during taxi-in possibly cause you to momentarily lose nosewheel steering? System 2 hydraulic pressure could be inoperative While under tow with both engines shut down, the only braking is from Emergency /parking brake from the system 1 and 2 emergency accumulator The shutdown flow should be accomplished until APU or external AC power is established Where can brake temp be monitored after shutdown? status page The after landing sequene for first officer flow is? Trim 4 flaps @ 0 lights at required APU on To prevent electrical power interruptions it is recommended Bring up the electrical strart up page and wait 10 seconds after pushin in the GPU button ensure aPU has stabilized Which cargo area, are live animals allowed? fwd cargo Single engine turns are allowed in the event of inop or unavailable ground support equipment and an inop APU True What sources of external power are available to the ERJ 175? Both AC and DC What needs to be done to hydraulic system 1 if we are taxing only with Engine 2 on? Manually turn on hydraulic system 1 with knob. Make sure it's turned back to AUTO when Engine 1 is on.

Mostrar más Leer menos
Institución
SKYWEST ERJ 175 SYSTEMS
Grado
SKYWEST ERJ 175 SYSTEMS











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
SKYWEST ERJ 175 SYSTEMS
Grado
SKYWEST ERJ 175 SYSTEMS

Información del documento

Subido en
7 de octubre de 2025
Número de páginas
57
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

SKYWEST ERJ 175 SYSTEMS EXAM
(ACTUAL 2025/2026) QUESTIONS WITH
100% VERIFIED CORRECT ANSWERS




What is the minimum battery voltage for normal ops?
22.5V




When is it appropriate to start the APU in conjunction with the
after landing sequence when flying for united or alaska/
When ground power not available at the gate and when
nearing the gate


What kind of checklist is the Safety and Power Up?
Captain or FO Read And Do checklist




what consideration must be given to shutting down an engine
after the 2-min cool down period?
Ensure it's not shutdown while turning the aircraft

,Why would shutting down the right engine during taxi-in
possibly cause you to momentarily lose nosewheel steering?
System 2 hydraulic pressure could be inoperative




While under tow with both engines shut down, the only
braking is from
Emergency /parking brake from the system 1 and 2
emergency accumulator




The shutdown flow should be accomplished until
APU or external AC power is established




Where can brake temp be monitored after shutdown?
status page


The after landing sequene for first officer flow is?
Trim 4 flaps @
0 lights at
required

,APU on




To prevent electrical power interruptions it is recommended
Bring up the electrical strart up page and wait 10 seconds
after pushin in the GPU button ensure aPU has stabilized




Which cargo area, are live animals allowed?
fwd cargo




Single engine turns are allowed in the event of inop or
unavailable ground support equipment and an inop APU
True




What sources of external power are available to the ERJ 175?
Both AC and DC

, What needs to be done to hydraulic system 1 if we are taxing
only with Engine 2 on?
Manually turn on hydraulic system 1 with knob. Make sure it's
turned back to AUTO when Engine 1 is on.




What is the main purpose of the Power Transfer Unit (PTU)?
Assist the landing gear retraction and extension. Should the
right engine or right EDP failure occur.




When will the Power Transfer Unit (PTU) automatically start?
Flaps not set to zero or landing gear not up and locked.
EDP 1 not failed.
Hydraulic reservoir 2 quantity above 12%.




When do we perform the originating checklist?
First flight of the day
Change in Crew
Aircraft swap
$17.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ExcelAcademia2026 Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2056
Miembro desde
4 año
Número de seguidores
1648
Documentos
7416
Última venta
3 días hace
EXCEL ACADEMIA TUTORS

At Excel Academia Tutoring, You will get solutions to all subjects in both assignments and major exams. Contact me for assistance. Good luck! Well-researched education materials for you. Expert in Nursing, Mathematics, Psychology, Biology etc. My Work has the Latest & Updated Exam Solutions, Study Guides and Notes (100% Verified Solutions that Guarantee Success)

3.7

337 reseñas

5
139
4
74
3
62
2
19
1
43

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes