1|Page
P-99 Low Pressure Boiler COF FDNY Newest 2025/2026 Complete
100 Questions And Correct Detailed Answers (Verified Answers)
|Brand New Version!!
A fill line in an oil burner system is a line used to: - ANSWER-Fill the
storage tank with oil.
The aquastat is located - ANSWER-Below the water line.
All heating, combustion, and cooking equipment shall be installed with
adequate clearances from _______ construction. - ANSWER-
Combustible
The equipment must be provided with ______ or the building
construction shall be _____ _____. - ANSWER-Insulation.
Fire Protected
During operation the surface of combustible construction materials will
not be raised to a temp higher than _____ degrees F. - ANSWER-170
degrees
,2|Page
Equipment shall be so that the means of access for ordinary operation
and maintenance will not be _______. - ANSWER-Hazardous
Acceptance Tests:
Boilers shall not be placed in operation until they have been _____ and
____ and an equipment ____ _____ has been issued by the ______. -
ANSWER-Inspected and tested.
Use permit, commissioner
Periodic Inspections: All boilers must be inspected at least _____ a
_____ including chimney connections. - ANSWER-Once a year
Owners Annual Statement: The owner of each boiler shall file an _____
written statement with the ________, specifying the _____of each
boiler and ______ for inspection. - ANSWER-Annual, commissioner,
location, arrangement.
Field Tests: all piping and oil storage tanks shall be _______ tested for
tightness by the ______ before the system is operated. - ANSWER-
Hydrostatically, contractor
The piping shall be tested at _____ times the max working pressure
applicable to that part of the piping system but at a pressure ____ than
the test pressure required for the storage tank. - ANSWER-1/2, less
, 3|Page
The min pressure for testing tanks shall be ____ times the max working
pressure but in no case less than ____ psi. - ANSWER-1 1/2, 25 psi
The hydrostatic pressure must be maintained until all ____ and _____
have been visually inspected for ___, but in no case less than _____
hour. - ANSWER-Joints, connections, leaks, 1/2 hour.
A record must be kept of the pressure test showing the name of the
_____ and the _____ at which the piping and tank were tested. -
ANSWER-Contractor, pressure
Gas piping must be tested by the _____ before operation. - ANSWER-
Contractor
For oil burning systems, ____ ____ giving instructions for the care and
operation of the system shall be permanently located in an easily _____
and _____ location near the equipment. - ANSWER-Instruction Cards,
visible, accessible
No oil burning equipment shall be operated until an equipment ____
_____ has been issued by the commissioner, the requirements of the
____ ____ control code have been met and until the approval for the
storage of ____ ____ has been given by the fire commissioner. -
ANSWER-Use permit, air pollution, fuel oil
P-99 Low Pressure Boiler COF FDNY Newest 2025/2026 Complete
100 Questions And Correct Detailed Answers (Verified Answers)
|Brand New Version!!
A fill line in an oil burner system is a line used to: - ANSWER-Fill the
storage tank with oil.
The aquastat is located - ANSWER-Below the water line.
All heating, combustion, and cooking equipment shall be installed with
adequate clearances from _______ construction. - ANSWER-
Combustible
The equipment must be provided with ______ or the building
construction shall be _____ _____. - ANSWER-Insulation.
Fire Protected
During operation the surface of combustible construction materials will
not be raised to a temp higher than _____ degrees F. - ANSWER-170
degrees
,2|Page
Equipment shall be so that the means of access for ordinary operation
and maintenance will not be _______. - ANSWER-Hazardous
Acceptance Tests:
Boilers shall not be placed in operation until they have been _____ and
____ and an equipment ____ _____ has been issued by the ______. -
ANSWER-Inspected and tested.
Use permit, commissioner
Periodic Inspections: All boilers must be inspected at least _____ a
_____ including chimney connections. - ANSWER-Once a year
Owners Annual Statement: The owner of each boiler shall file an _____
written statement with the ________, specifying the _____of each
boiler and ______ for inspection. - ANSWER-Annual, commissioner,
location, arrangement.
Field Tests: all piping and oil storage tanks shall be _______ tested for
tightness by the ______ before the system is operated. - ANSWER-
Hydrostatically, contractor
The piping shall be tested at _____ times the max working pressure
applicable to that part of the piping system but at a pressure ____ than
the test pressure required for the storage tank. - ANSWER-1/2, less
, 3|Page
The min pressure for testing tanks shall be ____ times the max working
pressure but in no case less than ____ psi. - ANSWER-1 1/2, 25 psi
The hydrostatic pressure must be maintained until all ____ and _____
have been visually inspected for ___, but in no case less than _____
hour. - ANSWER-Joints, connections, leaks, 1/2 hour.
A record must be kept of the pressure test showing the name of the
_____ and the _____ at which the piping and tank were tested. -
ANSWER-Contractor, pressure
Gas piping must be tested by the _____ before operation. - ANSWER-
Contractor
For oil burning systems, ____ ____ giving instructions for the care and
operation of the system shall be permanently located in an easily _____
and _____ location near the equipment. - ANSWER-Instruction Cards,
visible, accessible
No oil burning equipment shall be operated until an equipment ____
_____ has been issued by the commissioner, the requirements of the
____ ____ control code have been met and until the approval for the
storage of ____ ____ has been given by the fire commissioner. -
ANSWER-Use permit, air pollution, fuel oil