Chapter 1: Project Professionals, Design Phases, and the Construction Process
A typical commercial construction project begins with a( n ) __________ seeking
to develop a new or existing property to meets specific needs.
A. Architect
B. Engineer
C. General Contractor ( GC )
D. Owner - (ANSWER)Owner
Chapter 1: Project Professionals, Design Phases, and the Construction Process
The __________ is responsible for all inspections, the final building occupancy
approval sign-off, and the commissioning of all building systems.
A. Architect
B. Engineer
,2
C. General Contractor ( GC )
D. Owner - (ANSWER)General Contractor ( GC )
Chapter 1: Project Professionals, Design Phases, and the Construction Process
The __________ phase gives the owner the first opportunity to see the potential
design and get an approximation of the costs
A. Bidding
B. Construction document
C. Design development
D. Schematic design - (ANSWER)Schematic design
Chapter 1: Project Professionals, Design Phases, and the Construction Process
The __________ are the fully completed design that complies with building codes
and industry standards and are ready for bidding and, ultimately, the construction
of the facility
A. Addendum
B. Construction documents
C. Drawings
D. Specifications - (ANSWER)Construction documents
,3
Chapter 1: Project Professionals, Design Phases, and the Construction Process
The bidding method is often used for the electrical and VDV system portions of a
project.
A. Competing
B. Cost-plus
C. Labor-only
D. Negotiated/design-assist - (ANSWER)Labor-only
Chapter 1: Project Professionals, Design Phases, and the Construction Process
The __________ bidding method can often save time, provide flexibility, and
avoid the risk of removing completed or partially completed work and starting
over.
A. Competitive
B. Cost-plus
C. Labor-only
D. Negotiated/design-assist - (ANSWER)Cost-plus
Chapter 1: Project Professionals, Design Phases, and the Construction Process
, 4
Most often, the product selection for private work is specified by __________.
A. Cost
B. Industry standards
C. Specific OEMs
D. Performance - (ANSWER)Specific OEMS
Chapter 1: Project Professionals, Design Phases, and the Construction Process
A( n ) __________ is a document that project managers use to resolve conflicts
early in the process to attempt to eliminate costly corrective measures
A) Addendum
B) Construction change directive
C) Punch list
D) Request for information ( RFI ) - (ANSWER)Request for information ( RFI )
Chapter 1: Project Professionals, Design Phases, and the Construction Process
A( n ) __________ is typically used to provide clarification and small changes, such
as slightly altering locations or dimensions on a print.