Exam Questions and Verified Answers |
Already Graded A+
Chapter 6 - Development and Quality plan - 🧠ANSWER ✔✔
Objectives of having a development and quality plan - 🧠ANSWER
✔✔recruit team members, decide if waterfall or agile, resolve dev risks,
milestones, sprint lengths, give mgmt data for project control
Elements of plan for devs - 🧠ANSWER ✔✔specify deliverables, define
project interfaces, methodolity and tools, milestones, map of dev process,
cost estimate
element of plan for software quality - 🧠ANSWER ✔✔list of quality goals,
review activities, software tests, accepptance tests for external software,
procedures and dates for versions
,Classes of software dev risks - 🧠ANSWER ✔✔scheduling/timing risks,
system functionality risks, subcontracting risks, requirement mgmt risk,
resource usage and performance risk, personnel mgmt risk. must prioritize
risks!
boehm and ross's top 10 software risk items - 🧠ANSWER ✔✔developing
wrong functions, unrealistic schedule and budget, wrong interface for user,
gold plating, continuous stream of req changes, personnel shortfalls
Chapter 7 - Intergrating quality activities in project lifecycle - 🧠ANSWER
✔✔
factors that affect required intensity of sqa activities - 🧠ANSWER ✔✔project
factors (technical complexity and difficulty, severity of failure outcomes,
project magnitude), team factors (professional qualification of team
members, availability, experience, familiarity (new team members)),
verification process - 🧠ANSWER ✔✔does the product satisfy conditions at
the start of the phase
validation process - 🧠ANSWER ✔✔does product satisfy specified
requirements
, qualification process - 🧠ANSWER ✔✔is system or component suitible for
operational use
model's quantitiative result for DRE - 🧠ANSWER ✔✔measure total
effectiveness at removing defects, and the total costs to remove defects
Defect Removal Efficiency - 🧠ANSWER ✔✔gives a measure of the
development team ability to remove defects prior to release. It is calculated
as a ratio of defects resolved to total number of defects found. It is typically
measured prior and at the moment of release.
What is the inverted v diagram - 🧠ANSWER ✔✔dev activity - requirements,
system/HLD, architecture design, module design
Coding
unit testing, integration testing, system testing, UAT
Calculating DRE V1 - steps - 🧠ANSWER ✔✔assume 100% defects, get
average % of defects originating in each phase, calculate cost of each plan
via matrix