This document is an in-depth Texas Class A Wastewater Treatment certification exam prep guide for the 2025/2026 cycle, featuring 100+ solved multiple-choice questions with detailed calculations, scenarios, and rule-based answers aligned with TCEQ licensing requirements. Covering advanced operational and design topics, the content prepares candidates for real-world performance in high-capacity municipal and industrial wastewater treatment systems. Key subjects covered: Activated sludge processes, including extended air, contact stabilization, and conventional methods Anaerobic digestion, methane/CO₂ ratios, temperature maintenance, and sludge stabilization Biological Oxygen Demand (BOD) testing, parameters, seeding, and regulatory reporting Pump calculations, velocity, impeller sizing, horsepower, and lift station diagnostics Chlorination & dechlorination, DPD test interference, residuals, and optimal pH Federal & Texas regulations, including 30 TAC Chapter 217/317 and Clean Water Act mandates Trickling filters, RBC performance, nutrient loading, eutrophication, and nitrification Safety and confined space entry, hazard recognition (H₂S, CO, methane), fire extinguishers, and proper communication protocols Design criteria for manholes, slope, flow velocities, detention time, and collection systems SCADA, pH calibration, fecal coliform testing, and solids concentration metrics This guide is particularly suited for: Candidates preparing for the Texas Class A Wastewater Operator Exam Environmental and civil engineering students studying wastewater treatment systems Professionals working in municipal utilities, industrial pre-treatment systems, and regulatory compliance Trainers and instructors seeking realistic test simulations or review material This is a complete and exam-ready reference, combining operational knowledge, safety procedures, and engineering principles for top performance on both written exams and practical field assessments. Keywords: Texas wastewater exam, TCEQ Class A license, BOD test, sludge digestion, anaerobic treatment, trickling filter, activated sludge, chlorine residual, wastewater hydraulics, manhole design, pipe slope, pump calculation, sewer collection system, effluent toxicity, TCEQ compliance, aerobic digestion, confined space safety, wastewater treatment plant design

Mostrar más Leer menos
Institución
Texas Wastewater A License
Grado
Texas wastewater A license











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Texas wastewater A license
Grado
Texas wastewater A license

Información del documento

Subido en
23 de septiembre de 2025
Número de páginas
31
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Texas Wastewater Class A 2025/2026
Exam Questions and Answers | A+ Score
Assured



Seeding of BOD samples is necessary when samples - 🧠 ANSWER ✔✔(All

of the above) have a chlorine residual, have a previously been chlorinated,

have been subjected to high temperatures, contain high or low pH industrial

wastes

When is blue-green algae the most dominant on a pond treatment system?

- 🧠 ANSWER ✔✔Summer


A 30-inch diameter wastewater interceptor is observed to be flowing half-

full at about two fps. The approximate volume of wastewater flowing

through the pipe is 3.14x1.25 x 1.25 x 2 = 4.9 cfs x 449 = 2,200 gpm - 🧠

ANSWER ✔✔c. 2,200 gallons per minute

,A one-cylinder reciprocating sludge pump with a 10-inch bore and a 5-inch

stroke pumps at a rate of 50 cycles per minute. How many minutes must

the pump be operated to pump 5,000 gallons of sludge? 3.14x0.416 x

0.416 x0.416 x 50 x7.48 = 84.5 gpm 5000 gal = 59,2min 84.5 gpm b. 29 - 🧠

ANSWER ✔✔60 minutes


If an existing centrifugal pump motor is replaced with a motor with 25

percent more speed, the motor horsepower required will increase by 1.25 x

1.25 x 1.25 = 1.95 - 🧠 ANSWER ✔✔95 percent


When must TCEQ be notified about expansions of a treatment facility? - 🧠

ANSWER ✔✔Before construction


In an anaerobic digester, the percentage of methane and carbon dioxide

gas content should be - 🧠 ANSWER ✔✔70% methane, 30% carbon dioxide


The temperature of an anaerobic digester should be maintained at a

minimum of - 🧠 ANSWER ✔✔95° F


What type of wastewater treatment operates in the endogenous bacteria

growth phase? - 🧠 ANSWER ✔✔Extended air

,Why is recirculation needed in a trickling filter? - 🧠 ANSWER ✔✔Keep the

media wet Further reduce BOD All of the above (a, b, and c)

What type of fire extinguisher would be used on an electrical control panel

that has been de-energized? - 🧠 ANSWER ✔✔Class A Class C (a and d)


Disinfection with chlorine is the most effective at a pH of - 🧠 ANSWER

✔✔6.0


The biomass on a normal functioning RBC has what appearance? - 🧠

ANSWER ✔✔Grey to brown and 0.05 to 0.1 inch thick


The sludge from a primary clarifier should percent solids? - 🧠 ANSWER

✔✔4% to 6%


What is eutrophication in a pond system? - 🧠 ANSWER ✔✔Enrichment with

nitrogen and phosphorous Causes algae blooms (b and c)


How often should pH meters be calibrated? - 🧠 ANSWER ✔✔Daily


In Texas, pH meters are required to be calibrated on how many buffers? - 🧠

ANSWER ✔✔two




COPYRIGHT©PROFFKERRYMARTIN 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE.
PRIVACY STATEMENT. ALL RIGHTS RESERVED

, An industrial complex has a BOD discharge to the POTW of 500 pounds

per day. The population equivalent of this industry is 500 lbs = 2,941 0.17

lbs BOD person - 🧠 ANSWER ✔✔2941


The parameters of the BOD test are - 🧠 ANSWER ✔✔5 days at 20°

Centigrade


Standard Dimension Ratio in pvc pipe is defined as - 🧠 ANSWER ✔✔Ratio

of OD pipe diameter to wall thickness


How should shoring be removed from a trench? - 🧠 ANSWER ✔✔up from

the bottom up

In low pressure sewer systems where each tap must have a grinder pump

lift station, station is considered to be - 🧠 ANSWER ✔✔part of the collection

system and the responsibility of the utility


Effective communication depends on - 🧠 ANSWER ✔✔being a good

listener

When designing a wastewater collection system, the engineer considers

the population for how many years in the future? - 🧠 ANSWER ✔✔50
$15.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
PROFFKERRYMARTIN Liberty University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
137
Miembro desde
11 meses
Número de seguidores
2
Documentos
8322
Última venta
3 días hace
KERRYMARTIN

KERRYMARTIN EXAM HUB Assignments, Case Studies, Research, Essay writing service, Questions and Answers, Discussions etc. for students who want to see results twice as fast. I have done papers of various topics and complexities. I am punctual and always submit work on-deadline. I write engaging and informative content on all subjects. Send me your research papers, case studies, psychology papers, etc, and I’ll do them to the best of my abilities. Writing is my passion when it comes to academic work. I’ve got a good sense of structure and enjoy finding interesting ways to deliver information in any given paper. I love impressing clients with my work, and I am very punctual about deadlines. Send me your assignment and I’ll take it to the next level. I strive for my content to be of the highest quality. Your wishes come first— send me your requirements and I’ll make a piece of work with fresh ideas, consistent structure, and following the academic formatting rules. For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, free of charge!!!!!!!!!!!!

Lee mas Leer menos
3.3

29 reseñas

5
12
4
2
3
6
2
1
1
8

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes