100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Information Technology Project Management – Test Bank (Kathy Schwalbe, 9th Edition) | Complete Verified Q&As (Chapters 1–13)

Puntuación
-
Vendido
-
Páginas
490
Grado
A+
Subido en
21-09-2025
Escrito en
2025/2026

This document is a comprehensive test bank for Information Technology Project Management (9th Edition) by Kathy Schwalbe. It includes verified true/false, multiple choice, completion, and essay questions with correct answers, covering all chapters from 1 to 13. The material is structured to help students prepare for exams by practicing with official-style questions and answers across the full course scope.

Mostrar más Leer menos
Institución
Information Technology Project Management
Grado
Information Technology Project Management











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Libro relacionado

Escuela, estudio y materia

Institución
Information Technology Project Management
Grado
Information Technology Project Management

Información del documento

Subido en
21 de septiembre de 2025
Número de páginas
490
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

TEST BANK - Information Technology Project
Management, 9th Edition by Kathy Schwalbe
UPDATED CHAPTERS 1-13| Verified Q&As
Guaranteed for A+ PASS


TB
Ac




Page | 1
er

, Chapter 1: Introduction to Project Management
TRUE/FALSE
1. Until the 1980s, project management primarily focused on providing schedule and resource
data to top management in the military, computer, and construction industries.
CORRECT ANSWER: T
Until the 1980s, project management primarily focused on providing schedule and resource data
to top management in the military, computer, and construction industries. Today’s project
management involves much more, and people in every industry and every country manage
projects.
PTS: 1 DIF: Difficulty: Easy REF: p.2
OBJ: LO: 1-1 NAT: BUSPROG: Technology TOP: Introduction
KEY: Bloom's: Knowledge


2. A difference between operations and projects is that operations end when their objectives have
been reached, whereas projects do not.
CORRECT ANSWER: F
Projects are different from operations in that they end when their objectives have been reached or
the project has been terminated.
PTS: 1 DIF: Difficulty: Moderate REF: p.4
OBJ: LO: 1-2 NAT: BUSPROG: Analytic TOP: What is a Project?
KEY: Bloom's: Comprehension


3. Every project should have a well-defined objective.
CORRECT ANSWER: T
A project has a unique purpose. Every project should have a well-defined objective.
PTS: 1 DIF: Difficulty: Easy REF: p.6
OBJ: LO: 1-2 NAT: BUSPROG: Analytic TOP: What is a Project?
KEY: Bloom's: Knowledge
TB
Ac




Page | 2
er

,4. Projects should be developed in increments.
CORRECT ANSWER: T
A project is developed using progressive elaboration. Projects are often defined broadly when
they begin, and as time passes, the specific details of the project become clearer. Therefore,
projects should be developed in increments.
PTS: 1 DIF: Difficulty: Moderate REF: p.6
OBJ: LO: 1-2 NAT: BUSPROG: Analytic TOP: What is a Project?
KEY: Bloom's: Comprehension


5. Resources in a project should be used effectively because they are limited.
CORRECT ANSWER: T
A project requires resources, often from various areas. Resources, however, are limited and must
be used effectively to meet project and other corporate goals.
PTS: 1 DIF: Difficulty: Moderate REF: p. 7
OBJ: LO: 1-2 NAT: BUSPROG: Analytic TOP: What is a Project?
KEY: Bloom's: Comprehension


6. A project manager’s primary role is to provide the funding for a project.
CORRECT ANSWER: F
A project sponsor usually provides the direction and funding for a project.
PTS: 1 DIF: Difficulty: Easy REF: p.7
OBJ: LO: 1-2 NAT: BUSPROG: Analytic TOP: What is a Project?
KEY: Bloom's: Knowledge


7. One of the main reasons why project management is challenging is because of the factor of
uncertainty.
CORRECT ANSWER: T
TB




A project involves uncertainty. Every project is unique and thus it is sometimes difficult to
define its objectives clearly, estimate how long it will take to complete, or determine how much
it will cost. This uncertainty is one of the main reasons project management is so challenging.
Ac




Page | 3
er

, PTS: 1 DIF: Difficulty: Moderate REF: p.7
OBJ: LO: 1-2 NAT: BUSPROG: Analytic TOP: What is a Project?
KEY: Bloom's: Comprehension


8. Questions about how a team will track schedule performance is related to a project’s scope.
CORRECT ANSWER: F
Project scope deals with questions such as, ―What work will be done as part of the project?‖,
―What unique product, service, or result does the customer or sponsor expect from the project?‖,
or ―How will the scope be verified?‖
PTS: 1 DIF: Difficulty: Moderate REF: p.7
OBJ: LO: 1-2 NAT: BUSPROG: Technology TOP: What is a Project?
KEY: Bloom's: Comprehension


9. In order to be realistic, a project manager should always set discrete goals instead of a range of
objectives.
CORRECT ANSWER: F
Projects involve uncertainty and limited resources. Thus they rarely finish according to their
original scope, time, and cost goals. Instead of discrete target goals, it is often more realistic to
set a range of goals.
PTS: 1 DIF: Difficulty: Moderate REF: p.8
OBJ: LO: 1-2 NAT: BUSPROG: Analytic TOP: What is a Project?
KEY: Bloom's: Comprehension


10. Managing the triple constraint primarily involves making trade-offs between resources and
quality.
CORRECT ANSWER: F
Managing the triple constraint involves making trade-offs between scope, time, and cost goals
for a project. Experienced project managers know that one must decide which aspect of the
triple constraint is most important.
TB




PTS: 1 DIF: Difficulty: Easy REF: p.9
OBJ: LO: 1-2 NAT: BUSPROG: Analytic TOP: What is a Product?
Ac




Page | 4
er
$15.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TESTBANKSACER California University Of Pennsylvania
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
17
Miembro desde
4 meses
Número de seguidores
0
Documentos
220
Última venta
6 horas hace
TEST BANKS ACER

Welcome for the Best Quality Study Materials to ace your Studies. My aim is to provide learners with Test Banks, Solution and Instructor's Manuals for quality Studying. WELCOME ALL!!!...... PLEASE RATE & REVIEW MY STUDY MATERIALS .

2.0

2 reseñas

5
0
4
0
3
1
2
0
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes