SWPPP Walmart - Stormwater Exam Questions With
100%Correct Answers|| LATEST UPDATE 2025/26
The 1970's law that set into place the regulation of stormwater is: -CORRECTANSWER
The Clean Water Act
Requirements for managing stormwater activity on a construction site are outlined in the
following regulation: -CORRECTANSWER NPDES
Which of the following is never an allowable stormwater discharge from a construction
site? -CORRECTANSWER Discharge from contaminated groundwater
The Notice of termination can filed when: -CORRECTANSWER All construction activity,
inside and outside the building, is complete and permanent stabilization verified
Relative to stormwater permitting, all of the following must occur before construction
starts except: -CORRECTANSWER Submit the notice of termination (NOT)
Which erosion control best mgmt practice increases water infiltration, dissipates rainfall
energy and slows overland flow of stormwater -CORRECTANSWER Vegetation
Of the following factors that influence erosion rates, the one a contractor has the most
control over is: -CORRECTANSWER Groundcover
100%Correct Answers|| LATEST UPDATE 2025/26
The 1970's law that set into place the regulation of stormwater is: -CORRECTANSWER
The Clean Water Act
Requirements for managing stormwater activity on a construction site are outlined in the
following regulation: -CORRECTANSWER NPDES
Which of the following is never an allowable stormwater discharge from a construction
site? -CORRECTANSWER Discharge from contaminated groundwater
The Notice of termination can filed when: -CORRECTANSWER All construction activity,
inside and outside the building, is complete and permanent stabilization verified
Relative to stormwater permitting, all of the following must occur before construction
starts except: -CORRECTANSWER Submit the notice of termination (NOT)
Which erosion control best mgmt practice increases water infiltration, dissipates rainfall
energy and slows overland flow of stormwater -CORRECTANSWER Vegetation
Of the following factors that influence erosion rates, the one a contractor has the most
control over is: -CORRECTANSWER Groundcover