100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

API 653 EXAM QUESTIONS WITH 100% CORRECT ANSWERS GUARANTEED PASS

Puntuación
-
Vendido
-
Páginas
10
Grado
A+
Subido en
19-09-2025
Escrito en
2025/2026

API 653 EXAM QUESTIONS WITH 100% CORRECT ANSWERS GUARANTEED PASS

Institución
API 653
Grado
API 653









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
API 653
Grado
API 653

Información del documento

Subido en
19 de septiembre de 2025
Número de páginas
10
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

API 653 EXAM QUESTIONS WITH
100% CORRECT ANSWERS
GUARANTEED PASS

when a new tank has no release prevention systems, the interval from initial service
until the initial internal inspection shall not exceed years - Answer-10

when a tank has a release prevention system consisting of an original nominal bottom
thickness 5/16 inch or greater, what is the initial internal inspection interval - Answer-12
years

when a tank has an RPS consisting of cathodic protection of the soil side of the primary
tank bottom, which is the initial internal inspection interval - Answer-12 years

when a tank has an RPS consisting of a thin film lining of the product side of the tank
bottom, which is the initial internal inspection interval - Answer-12 years

when a tank has an RPS consisting of fiberglass reinforced lining of the product side of
the tank bottom, which is the initial internal inspection interval - Answer-13 years

when a tank has an RPS consisting of cathodic protection plus a thin film lining, which is
the initial internal inspection interval - Answer-14 years

when a tank has an RPS consisting of cathodic Protection Plus fiberglass reinforced
lining, which is the initial internal inspection interval - Answer-15 years

when a tank has an RPS consisting of a release prevention barrier and a similar service
assessment, which is the initial internal inspection interval - Answer-20 years

when a tank shell has a corroded area with a thickness lower than allowed, there are 3
options, which are - Answer--damaged areas shall be repaired the
-allowable liquid level of the tank reduced
-tank retired


what is the minimum thickness for a tank floor plate with no means for leak detection or
secondary containment if an RBI program is not in place - Answer-0.1 inch reference
table 4.4 API 653

, when a tank has an RPS consisting of release prevention barrier when a risk-based
inspection was performed, which is the initial internal inspection interval - Answer-25
years

hobby assessment shall consist of a systematic evaluation of both the and
the associated consequence of failure - Answer-likelihood of failure

how many types of Records should an operator keep at all times? - Answer-3,
construction records,
inspection history and repair / alterations history

all you shall joints shall be joints with complete penetration and fusion -
Answer-butt welded

each existing shell joint should comply with - Answer-the as-built standard

who can authorize repair? - Answer-inspector or engineer experience in storage tank
design

the minimum dimension for a replacement shell plate is - Answer-12 inches

when welding shell seams, which seam should weld first: horizontal or vertical? -
Answer-vertical

lapped patch shell repairs shall not be used on any shell course thickness that exceeds
- Answer-1/2 in

lapped patch show repair plates shall not be less than - Answer-3/16 inch

the shape of the repair plate may be circular, oblong, square, or rectangular. All
Corners, except at the Shell to bottom joint, shall be rounded to a minimum radius of -
Answer-2 inches

lapped patch repair plates positioned on the shell interior shall be located such that the
toe-to-toe weld clearances are a minimum of to the shell to bottom weld -
Answer-6 inches

the minimum lapped patch repair plate Dimension is - Answer-4 inches

what is the maximum vertical dimension of a lapped patch repair plate? - Answer-48
inches

what is the maximum horizontal dimension of a lapped repair plate? - Answer-72 inches
can you put a patch plate over 1/2 inch diameter hole, then weld the inner perimeter of
the hole? - Answer-no. The whole must be at least 2 inch diameter
$17.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
wisdompoint chamberlain college of nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
114
Miembro desde
2 año
Número de seguidores
66
Documentos
5307
Última venta
1 semana hace
Nursing Tec

3.7

16 reseñas

5
6
4
3
3
5
2
0
1
2

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes