100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

MGMT 339 FINAL EXAM QUESTIONS WITH 100% CORRECT ANSWERS | LATEST VERSION 2025/2026.

Puntuación
-
Vendido
-
Páginas
19
Grado
A+
Subido en
17-09-2025
Escrito en
2025/2026

Facilities planning: A. Refers to medium-range capacity decisions B. Has no impact on other capacity decisions C. Refers to determining long-term capacity requirements D. Requires capacity planning for one year or less - ANS C Which of the following statements regarding capacity is NOT correct? A. Capacity can be measured in several units such as hours of output, the number of units produced, the number of customers served, etc. B. Capacity requirement is measured in terms of long-term, intermediate period and short-term. C. Capacity is the maximum output that could be produced over a specific period of time. D. All of the above are correct. - ANS D Aggregate planning: A. is also called production planning. 2 | Page @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED B. is concerned with meeting the demand for the intermediate period at a minimum cost C. considers using overtime, subcontracting, and inventory levels D. All of the above. - ANS D Which of the following is/are used to influence demand in aggregate planning? (Select the best answer) A. Pricing, inventory, and advertising B. Reservations, pricing, and advertising C. Subcontracting, advertising, and pricing D. Inventory, reservations, and pricing - ANS B In developing aggregate production plan, subcontracting and hiring approaches are used to influence _____________. A. demand B. supply C. quality conformance D. Cannot be determined. - ANS B A major difference between facilities planning and scheduling is that: A. Facilities planning refers to a long-range capacity plan and scheduling refers to a short-range capacity plan. B. Facilities planning is concerned with allocating available resources and scheduling with the acquisition of resources. C. Facilities planning refers to medium-range resource requirement and scheduling refers to long-range capacity requirement. D. None of the a

Mostrar más Leer menos
Institución
MGMT 339
Grado
MGMT 339

Vista previa del contenido

MGMT 339 FINAL EXAM QUESTIONS
WITH 100% CORRECT ANSWERS |
LATEST VERSION 2025/2026.




Facilities planning:


A. Refers to medium-range capacity decisions
B. Has no impact on other capacity decisions
C. Refers to determining long-term capacity requirements

D. Requires capacity planning for one year or less - ANS C


Which of the following statements regarding capacity is NOT correct?


A. Capacity can be measured in several units such as hours of output, the number of units
produced, the number of customers served, etc.
B. Capacity requirement is measured in terms of long-term, intermediate period and
short-term.
C. Capacity is the maximum output that could be produced over a specific period of time.

D. All of the above are correct. - ANS D


Aggregate planning:


A. is also called production planning.

1 | Page @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED

,B. is concerned with meeting the demand for the intermediate period at a minimum cost
C. considers using overtime, subcontracting, and inventory levels

D. All of the above. - ANS D


Which of the following is/are used to influence demand in aggregate planning? (Select the best
answer)


A. Pricing, inventory, and advertising
B. Reservations, pricing, and advertising
C. Subcontracting, advertising, and pricing

D. Inventory, reservations, and pricing - ANS B


In developing aggregate production plan, subcontracting and hiring approaches are used to
influence _____________.


A. demand
B. supply
C. quality conformance

D. Cannot be determined. - ANS B


A major difference between facilities planning and scheduling is that:


A. Facilities planning refers to a long-range capacity plan and scheduling refers to a short-range
capacity plan.
B. Facilities planning is concerned with allocating available resources and scheduling with the
acquisition of resources.
C. Facilities planning refers to medium-range resource requirement and scheduling refers to
long-range capacity requirement.

D. None of the above. - ANS A



2 | Page @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED

, Suppose the cost of not having adequate capacity is very high. What type of capacity cushion
strategy is a company likely to use in this situation?


A. Small cushion
B. Large cushion
C. Moderate cushion

D. None of the above - ANS B


The percentage of actual output to available capacity is called:


A. Small capacity cushion
B. Capacity utilization
C. Peak capacity
D. Nominal capacity

E. Only (A) and (C) above. - ANS B


Which of the following statement(s) is NOT correct about aggregate planning?


A. Aggregate planning is appropriate for planning capacity both in manufacturing and service
operations.
B. Aggregate planning seeks to meet the required demand at the minimum possible cost.
C. Aggregate planning seeks to determine overall long-term output requirement.

D. Both (a) and (b) above - ANS C


In using a level strategy of aggregate planning demand is met by:


A. Changing the production level to match demand as needed.
B. Producing at a constant rate plus using overtime or subcontracting if needed.
C. Producing at a constant rate and using inventory to absorb fluctuations in demand.

3 | Page @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED

Escuela, estudio y materia

Institución
MGMT 339
Grado
MGMT 339

Información del documento

Subido en
17 de septiembre de 2025
Número de páginas
19
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$11.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Brightstars Havard School
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
201
Miembro desde
1 año
Número de seguidores
7
Documentos
12554
Última venta
5 días hace
VERIFIED EXAMS AND STUDY GUIDES.

Here, you will find Study Notes, Exam answer packs 100% Guarenteed success.

3.3

31 reseñas

5
10
4
4
3
8
2
3
1
6

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes