PJM Generation Dispatcher Exam Practice Question and answers 100% correct 2025/2026 An EXCITER on a traditional generator does what? - correct answer Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are genrator _________________. - correct answer Limits When synchronizing to the interconnection, what needs to be synchronized? - correct answer Frequency, Voltage, and phase angle. GMD (GeoMagnetic Disturbance) procedure is implemented when? - correct answer 10A or greater is measured by special equipment at Missouri Ave or Meadowbrook and the measurement is confirmed by one of the following other sources: Excess transformer current @ Meadowbrook, Beddington, Donbs, or Black Oak, high MVAR requirements on transformers @ Hopw Creek or Salem nuclear subs, or high DC measurements @ Limerick or Peach Bottom. What are the 2 types of National Terrorism Advisory Alerts? - correct answer Elevated and Imminent. What action does PJM take for a terrorist attack, fuel delivery emergency, or GMD's? - correct answer Conservative Operations

Mostrar más Leer menos
Institución
PJM Generation Dispatcher
Grado
PJM Generation Dispatcher









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
PJM Generation Dispatcher
Grado
PJM Generation Dispatcher

Información del documento

Subido en
16 de septiembre de 2025
Número de páginas
8
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PJM Generation Dispatcher Exam
Practice Question and answers 100%
correct 2025/2026
An EXCITER on a traditional generator does what? - correct answer
✔Voltage regulation (AVR) if you change the excitation current, you change
the voltage.


ECO Min, ECO Max, and EMERG Max are genrator _________________. -
correct answer ✔Limits


When synchronizing to the interconnection, what needs to be synchronized? -
correct answer ✔Frequency, Voltage, and phase angle.


GMD (GeoMagnetic Disturbance) procedure is implemented when? - correct
answer ✔10A or greater is measured by special equipment at Missouri Ave
or Meadowbrook and the measurement is confirmed by one of the following
other sources: Excess transformer current @ Meadowbrook, Beddington,
Donbs, or Black Oak, high MVAR requirements on transformers @ Hopw
Creek or Salem nuclear subs, or high DC measurements @ Limerick or
Peach Bottom.


What are the 2 types of National Terrorism Advisory Alerts? - correct answer
✔Elevated and Imminent.


What action does PJM take for a terrorist attack, fuel delivery emergency, or
GMD's? - correct answer ✔Conservative Operations


What does PJM put the most emphasis on during a terrorist/sabotage event? -
correct answer ✔Operations and Communications

, What does PJM request during a low voltage alert? - correct answer ✔RRC -
reactive reserve check


PJM issues a Heavy Load Voltage Warning how many hours prior to
implementation? - correct answer ✔4 hours


What should generation owners/operators do during a High System Voltage
Action? - correct answer ✔Operate at the lower bandwidth of the voltage
schedule.


How many hours do you have to report a 24-hr reportable NERC disturbance?
- correct answer ✔6 hours


What report is generated during a Max Emergency Gen Alert? - correct
answer ✔SSR - Supplementary Status Report


What part of the SSR is the Fuel Limited Resources accounted for? - correct
answer ✔Part G Resource Limited Units which are units that are not able to
run at max capacity for more than 72 hours.


What kind of Emergency Procedures occur during real time operating hours? -
correct answer ✔Actions


What is the per Unit (p.u.) for a 345 kV nominal voltage that is currently at 348
kV? - correct answer ✔348/345 = 1.008 pu


What is the Emergency Reducible Generation (ERG) if the Eco Min is 100 and
the Emergency Min is 75? - correct answer ✔Eco Min - Emerg Min = 25MW
$16.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Academia199 Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
351
Miembro desde
3 año
Número de seguidores
208
Documentos
19101
Última venta
1 semana hace

3.9

50 reseñas

5
27
4
6
3
7
2
3
1
7

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes