DBIA EXAM 2 STUDY GUIDE PRACTICE QUESTIONS AND CORRECT ANSWERS 100% VERIFIED. _____ _____ is the belief that there is a technique, method or process that is more effective at delivering a particular outcome than any other Best Practice A Best Practice is the belief that there is a ______ , _____ or _____ that is more effective at delivering a particular outcome than any other. - technique - method - process How many best practices are there? 10 What are the 3 areas that the implementing techniques are categorized into? 1. Procurement 2. Contracting 3. Execution Who leads the overall design effort or design and engineering of a specific discipline? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator b) Designer of Record Who facilitates "Marriage" between design professionals and cost estimators? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator c) Design Manager Who advocates for design excellence within the DB team? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator c) Design Manager Who manages design information flow & deliverables? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator c) Design Manager Who manages design performance interface? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator b) Designer of Record The Integrated Project Leader is a traditional hard-bid project manager. True or False? False Who has to perform their design services within a common "Standard of Care"? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator b) Designer of Record Who are considered to be "trained creative problem solvers"? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator b) Designer of Record Who sustains a collaborative environment among people with diverse roles, backgrounds, and opinions? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator c) Design Manager Who monitors design-to-budget process? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator c) Design Manager Who facilitates constructability reviews? a) Integrated Project Leader b) Designer of Record c) Design Manager d) Estimator c) Design Manager

Vista previa del contenido

DBIA EXAM 2 STUDY GUIDE PRACTICE QUESTIONS AND CORRECT ANSWERS
100% VERIFIED.


_____ _____ is the belief that there is a technique, method or process that is more
effective at delivering a particular outcome than any other
Best Practice

A Best Practice is the belief that there is a ______ , _____ or _____ that is more
effective at delivering a particular outcome than any other.
- technique
- method
- process

How many best practices are there?
10

What are the 3 areas that the implementing techniques are categorized into?
1. Procurement
2. Contracting
3. Execution

Who leads the overall design effort or design and engineering of a specific
discipline?

a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator
b) Designer of Record

Who facilitates "Marriage" between design professionals and cost estimators?

a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator
c) Design Manager

Who advocates for design excellence within the DB team?

a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator
c) Design Manager

, Who manages design information flow & deliverables?

a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator
c) Design Manager

Who manages design performance interface?

a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator
b) Designer of Record

The Integrated Project Leader is a traditional hard-bid project manager.

True or False?
False

Who has to perform their design services within a common "Standard of Care"?

a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator
b) Designer of Record

Who are considered to be "trained creative problem solvers"?

a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator
b) Designer of Record

Who sustains a collaborative environment among people with diverse roles,
backgrounds, and opinions?

a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator
c) Design Manager

Información del documento

Subido en
11 de septiembre de 2025
Número de páginas
14
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.39

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
NurseQueen1
4.7
(3)
Vendido
4
Seguidores
0
Artículos
196
Última venta
8 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes