100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

ITEC 1010 CHAPTER 8 EXAM QUESTIONS AND ANSWERS SOLVED CORRECTLY LATEST UPDATE

Puntuación
-
Vendido
-
Páginas
13
Grado
A+
Subido en
10-09-2025
Escrito en
2025/2026

ITEC 1010 CHAPTER 8 EXAM QUESTIONS AND ANSWERS SOLVED CORRECTLY LATEST UPDATE 1. Pressure to increase profitability and improve operational efficiencies often drives organizations to implement new approaches and technology. a. True b. False - Answers True 2. The purpose of studying a system is to identify the strengths and weaknesses of the existing system and examine current inputs, outputs, processes, security and controls, and system performance. a. True b. False - Answers True 3. Joint application development (JAD) sessions with a cross section of users and stakeholders in a project are an effective way to define system requirements. a. True b. False - Answers True 4. Security and control considerations are a negligible part of the entire system development process. a. True b. False - Answers False 5. A data flow diagram (DFD) does not provide any information about process timing. a. True b. False - Answers True 6. Feasibility analysis assesses the technical, economic, legal, operational, and schedule feasibility of a project. a. True b. False - Answers True 7. The disaster recovery plan focuses on technology recovery and identifies the people or the teams that are responsible to take action in the event of a disaster, what exactly these people will do when a disaster strikes, and the information system resources required to support critical business processes. a. True b. False - Answers True 8. All members of a system investigation team must be co-located to ensure a successful start to a project. a. True b. False - Answers False 9. Operational feasibility takes into account the need to meet certain system performance requirements that are considered important to system users and stakeholders. a. True b. False - Answers True 10. The primary outcome of systems analysis is a prioritized list of system requirements and a recommendation of how to proceed with a project. a. True b. False - Answers True 11. System testing is often done by independent testers who are not involved in developing program code. a. True b. False - Answers True 12. Even if unit testing is successful, developers cannot assume they can combine individual components into a working system without any problems. a. True b. False - Answers True 13. While discussing the preliminary feasibility of a project, your colleague insists that figures used in economic feasibility be very accurate down to the last cent. His claim is appropriate and not uncommon. a. True b. False - Answers False 14. User acceptance testing (UAT) is a critical activity that must be completed successfully before newly developed software can be rolled out to the market. a. True b. False - Answers True 15. The eventual success of any system solely depends on how users work with it. a. True b. False - Answers False 16. Unit testing uncovers any defects in the interface between individual components of an information system. a. True b. False - Answers False 17. Perceived usefulness and perceived ease of use do not have any influence in determining whether someone will use an information system. a. True

Mostrar más Leer menos
Institución
ITEC 1010
Grado
ITEC 1010









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
ITEC 1010
Grado
ITEC 1010

Información del documento

Subido en
10 de septiembre de 2025
Número de páginas
13
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

ITEC 1010 CHAPTER 8 EXAM QUESTIONS AND ANSWERS SOLVED CORRECTLY LATEST
UPDATE 2025-2026

1. Pressure to increase profitability and improve operational efficiencies often drives
organizations to implement new approaches and technology.

a. True

b. False - Answers True

2. The purpose of studying a system is to identify the strengths and weaknesses of the existing
system and examine current inputs, outputs, processes, security and controls, and system
performance.

a. True

b. False - Answers True

3. Joint application development (JAD) sessions with a cross section of users and stakeholders
in a project are an effective way to define system requirements.

a. True

b. False - Answers True

4. Security and control considerations are a negligible part of the entire system development
process.

a. True

b. False - Answers False

5. A data flow diagram (DFD) does not provide any information about process timing.

a. True

b. False - Answers True

6. Feasibility analysis assesses the technical, economic, legal, operational, and schedule
feasibility of a project.

a. True

b. False - Answers True

7. The disaster recovery plan focuses on technology recovery and identifies the people or the
teams that are responsible to take action in the event of a disaster, what exactly these people
will do when a disaster strikes, and the information system resources required to support

, critical business processes.

a. True

b. False - Answers True

8. All members of a system investigation team must be co-located to ensure a successful start
to a project.

a. True

b. False - Answers False

9. Operational feasibility takes into account the need to meet certain system performance
requirements that are considered important to system users and stakeholders.

a. True

b. False - Answers True

10. The primary outcome of systems analysis is a prioritized list of system requirements and a
recommendation of how to proceed with a project.

a. True

b. False - Answers True

11. System testing is often done by independent testers who are not involved in developing
program code.

a. True

b. False - Answers True

12. Even if unit testing is successful, developers cannot assume they can combine individual
components into a working system without any problems.

a. True

b. False - Answers True

13. While discussing the preliminary feasibility of a project, your colleague insists that figures
used in economic feasibility be very accurate down to the last cent. His claim is appropriate and
not uncommon.

a. True

b. False - Answers False
$10.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TutorJosh Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
330
Miembro desde
1 año
Número de seguidores
16
Documentos
28206
Última venta
7 horas hace
Tutor Joshua

Here You will find all Documents and Package Deals Offered By Tutor Joshua.

3.6

53 reseñas

5
18
4
14
3
12
2
0
1
9

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes