ISA Utility Specialist Ch. 2 Program and Personnel Management QUESTIONS & ANSWERS Means to justify the allocation of resources, set priorities, and make decisions regarding what can and cannot be completed. - correct answer Budget Monetary outlay for relatively large sums of money invested over multiple years. - correct answer Capital budget

Mostrar más Leer menos
Institución
ISA Utility Specialist
Grado
ISA utility specialist









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
ISA utility specialist
Grado
ISA utility specialist

Información del documento

Subido en
6 de septiembre de 2025
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

ISA Utility Specialist Ch. 2 Program
and Personnel Management
QUESTIONS & ANSWERS

Means to justify the allocation of resources, set priorities, and make decisions regarding what
can and cannot be completed. - correct answer ✔✔Budget



Monetary outlay for relatively large sums of money invested over multiple years. - correct
answer ✔✔Capital budget



Completing all necessary line clearance on a feeder or circuit basis. - correct answer ✔✔Circuit
work



Depiction of the concept of triple constraint in project management, consisting of time, cost,
and scope. - correct answer ✔✔Constraint triangle



A legally enforceable agreement between two or more parties. Every contract has five basic
elements: offer, acceptance, consideration, legal and possible objective, and competent parties.
- correct answer ✔✔Contract



Accounting configuration for expenditures that do not generate income. - correct answer
✔✔Cost center



In project management, the longest period of time a series of task requires from project
beginning to end. - correct answer ✔✔Critical path

, A proposal or plan that outlines project expenditures, outputs, and alternatives, which receive
funding in order of priority. - correct answer ✔✔Decision package



Relationships that dictate when tasks in the work breakdown structure begin and end. - correct
answer ✔✔Dependencies



Contract without a separation date. - correct answer ✔✔Evergreen contract



Layered mapping application consisting of a base map and overlays, containing features and
information that can be viewed singularly or in combination. - correct answer ✔✔Geographic
information system (GPS)



Distribution cycle work preformed within a specified geographic boundary. - correct answer
✔✔Grid work



Process by which limited tree work is scheduled on a specific area of the network where shorts
or outages are occurring. - correct answer ✔✔Hotspotting



Contractual target against which a contractor is evaluated. It can include unit price components
(i.e. cost per tree, acre, or mile), as well as elements, such as work quality, customer
satisfaction, reliability, safety, certifications, or other factors. - correct answer ✔✔Key
performance indicator (KPI)



Organization of employees that collectively negotiate wages, benefits, working conditions, and
other matters. - correct answer ✔✔Labor union



Contractural strategy where vendors submit a single price for a set amount of work (e.g. project
or the entire account for a specified period of time). - correct answer ✔✔Lump sum contract
$11.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
STUVIA2024
5.0
(1)

Documento también disponible en un lote

Conoce al vendedor

Seller avatar
STUVIA2024 Chamberlain College Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
4
Miembro desde
7 meses
Número de seguidores
0
Documentos
4812
Última venta
1 semana hace

5.0

1 reseñas

5
1
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes