100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

CTS Exam Prep 2026 Questions and Answers 100% Pass Guaranteed

Puntuación
-
Vendido
-
Páginas
37
Grado
A+
Subido en
04-09-2025
Escrito en
2025/2026

CTS Exam Prep 2026 Questions and Answers 100% Pass Guaranteed

Institución
Avixa CTS
Grado
Avixa CTS











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Avixa CTS
Grado
Avixa CTS

Información del documento

Subido en
4 de septiembre de 2025
Número de páginas
37
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CTS Exam Prep 2026 Questions and
Answers 100% Pass Guaranteed

What are the four teams that comprise the overall Project Team? - Correct answer-

Owner, Design, Installation, and Management

Who would belong to the Design team? - Correct answer-Anyone with Consultant

in their title except the moving consultant

Which groups make up the Management Team? - Correct answer-Developer,

Construction Manager, and Building Management Agency

The End-User, Facility Manager and Building Committee comprise which team

within the Project Team? - Correct answer-Owner

Which group represent the generic roles that are important to the Project process? -

Correct answer-Project Managers, Designers and Installers

Which project characteristics must be considered in order to determine which

method is best suited for a particular project? - Correct answer-Schedule, Size,

Type, Complexity, and Procurement Requirements



©COPYRIGHT 2025, ALL RIGHTS RESERVE 1

,What is an important aspect of funding that has a direct impact on the project

process and design/installation? - Correct answer-Technical Support Funding

Whether a construction project is large or small, which milestones must be

achieved in a typical schedule? - Correct answer-Programming, Building Design,

AV Bid, and Move-In

What type of project is a typical Consultant-Led Design-Bid-Build contract

structure good for? - Correct answer-Long term projects with extended project

cycles

What is the risk in using an OFE/Integrator Installed contract structure? - Correct

answer-System and infrastructure design and facility functionality may suffer

What are some of the important project scope and size considerations in selecting

an AV provider? - Correct answer-Financial Stability, Current Workload, and

Company Credentials

What type of document typically includes Project Size Requirements, Corporate

Profile, Team Personnel, and Warranty Response Time? - Correct answer-RFQ

a significant difference between the Two-Envelope Bid

Method and the Qualifications- Based Selection Method? - Correct answer-

Negotiate with the highest ranking firm to finalize the contract


©COPYRIGHT 2025, ALL RIGHTS RESERVE 2

,What is one of the disadvantages of contracting the AV integrator to the electrical

subcontractor? - Correct answer-More layers of responsibility and communication

When conducting a complete project bid process, what milestone follows the

issuing of the RFP? - Correct answer-Pre-Bid Meeting

Under what circumstances would you likely use an A305-1986 form? - Correct

answer-Scoring responses to an RFQ

What is the ideal way to contract an AV integrator? - Correct answer-Directly to

the Owner

The process of identifying the activities that end-users need to perform, and

developing the functional descriptions of your systems is referred to as:? - Correct

answer-Needs Analysis

What is the main task of the third Step of the Program Phase of a Project? - Correct

answer-Conducting program meetings

What should be included in the written Program Report? - Correct answer-...A

conceptual and functional system description

The more accurate means to estimate dimensions of a commercial space during a

site inspection would be to? - Correct answer-Count Ceiling Tiles in a drop tile

instalation

©COPYRIGHT 2025, ALL RIGHTS RESERVE 3

, A client requires a new boardroom. The sales person and engineer are sent to the

premises to measure the facility and talk to the client. At this stage they should be

performing a _ - Correct answer-Needs Analysis

Sightlines for audience viewing in a given presentation space can be improved by:

- Correct answer-Providing a sloped, or stepped, seating arrangement

After presenting a proposal, what is the correct plan of action for following up with

the client? - Correct answer-Regularly, until a decision is made

AV professionals determine the end user's needs by examining three things: the

required applications, the tasks, and the: - Correct answer-Functions to support the

applications

When working with a client to design an AV solution for a new conference center,

the client requests a detailed budget for the equipment and installation. What phase

is the project in? - Correct answer-Design phase

The HDTV aspect ratio is equal to which of the following? - Correct answer-1.78:1

Please select the appropriate resolution for SXGA. - Correct answer-1280 x 1024

The Brightness control adjusts which level? - Correct answer-Black Level




©COPYRIGHT 2025, ALL RIGHTS RESERVE 4
$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EmillyCharlotte Howard Community College
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
95
Miembro desde
1 año
Número de seguidores
4
Documentos
11950
Última venta
16 horas hace
ALL-MAJOR.

On this page, you find all documents, package deals, and flashcards offered by seller Emilly Charlotte.

3.6

20 reseñas

5
7
4
6
3
2
2
2
1
3

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes