3B2 - ULTIMATE ABSA STUDY GUIDE C1-15 BRAND NEW OFFICIAL QUESTIONS WITH ANSWERS.

Document preview thumbnail
Vista previa 4 fuera de 434 páginas

3B2 - ULTIMATE ABSA STUDY GUIDE C1-15 BRAND NEW OFFICIAL QUESTIONS WITH ANSWERS.

Vista previa del contenido

Page | 1

3B2 - ULTIMATE ABSA STUDY GUIDE
C1-15 BRAND NEW OFFICIAL
QUESTIONS WITH ANSWERS.

A machine operating with vibration above the safe limits should
be immediately reported to the:
a. Supervisor
b. Safety committee
c. Workers, Compensation Board
d. Manufacturer
e. Plant manager. - correct answer -a




Safety valves mounted on steam boilers may be gagged:
a. During hydrostatic test
b. When greater pressure than the valve set pressure is required
for production
c. When valve spring breaks and the boiler is not scheduled for a
maintenance shut down for ten months
d. Only when the valve is leaking a significant amount of steam
e. Not for any of the above reasons. - correct answer -a

, Page | 2

Foundations for machinery are required to:
a. Increase kilowatt output of prime movers
b. Compensate for misalignment between prime mover and driven
machine
c. Transfer vibration from prime mover to driven machine
d. Absorb vibration
e. Allow for easy replacement of flex couplings. - correct answer -
d




Before entering the mud drum of a water tube boiler for an
internal inspection, when other boilers in the plant are operating,
you should:
1. Make sure the boiler is full of water
2. Blank off or disconnect the blow off lines
3. Blank off or disconnect or close the steam header and non
return valve, with the drain between the valves open and showing
no signs of the line being pressurized
4. Blank off or disconnect the feed water line
a. 1, 2, 3
b. 1, 3, 4
c. 2, 3, 4
d. 1, 2, 4
e. 1, 2, 3, 4. - correct answer -c

, Page | 3



Safety can be promoted and willingly adhered to by a combination
of the following actions.
1. Having, employees attend and participate in safety meetings
2. Keeping safety posters placed throughout the plant
3. Management and supervisors setting a good example
4. Imposing stiff fines on safety lax employees
a. 1, 2, 3, 4
b. 2, 3, 4
c. 1, 2, 3
d. 1, 3, 4
e. 2, 4. - correct answer -c




When a piece of equipment begins to exhibit signs of unsafe
performance, such as excessive vibration, this condition should
be immediately reported to the:
a. Plant manager
b. Immediate supervisor
c. Plant safety committee
d. Workers, Compensation Board
e. Manufacturer's dealer or agent. - correct answer -b

, Page | 4

The 3-4-5 layout method used for locating base lines when
installing machinery:
a. Is accurate if developed with a common, square
b. Is developed using angles other than 90 degrees
c. Requires at least one 90 degree angle
d. Can be traced directly from the installation drawings
e. Is not considered accurate. - correct answer -c




Priority scheduling dictates the work that must be done in a given
sequence. First priority category would include:
1. Safety of equipment and personnel
2. Painting of equipment
3. Replacement of damaged bearings
4. Replacement of ruptured lubricating line
a. 1, 2
b. 1, 3,4
c. 3, 4
d. 1, 2, 3,
e. 2. - correct answer -b




Convenience assignment maintenance scheduling:
a. Allows maintenance to be completed at the convenience of the

Información del documento

Subido en
1 de septiembre de 2025
Número de páginas
434
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$16.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Savvynurse
3.6
(58)
Vendido
251
Seguidores
7
Artículos
7844
Última venta
1 mes hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes