Owner nn- nnCORRECT nn ANSWER-Principle nn stakeholder -
nn nn initiates nn project,
nnassumes nnrisk, nn
nn
provides
nnfunding
nn
AHJ nn- nnAuthorities nnHaving nnJurisdiction nn- nnCORRECT nnANSWER-Protect nnpublic
nnhealth, nn
nn
safety nnand
nnwelfare
nn
Design nnTeam nn- nnCORRECT nnANSWER-Address nnplanning nnissues, nndetermine
nndesign nnprogram, nnidentify nncodes nnand nnregulations, nnproduce nnprocurement nnand
nnconstruction nndocuments, nnadminister nnconstruction nncontract, nn*provide nnQA/QC
nnprocedures* nn
nn
Contractor nnTeam nn- nnCORRECT nnANSWER-Entity nnthat nnconstructs nna nnfacility. nnUses
nnmanagement nnabilities nnto nngather nnlabor nnforces, nnsubs, nnand
nnmaterial/product/equipment nnsuppliers nn
nn
Supplier nnTeam nn- nnCORRECT nnANSWER-Furnishes nnthe nnmaterials nnand nnproducts
nnfor nnthe nn
nn
facility nnto nnbe nnconstructed. nnFabricator, nnDistributor, nnManufacturer,
nnSupplier.
nn
Facility nnLife nnCycle nn- nnCORRECT nnANSWER-The nnlife nncycle nnof nna nnfacility, nnfrom
nnconcept nnthrough nnconstruction nnto nnuse nnand nneventual nndeconstruction. nn nn
Project nnConception nn
Project nnDelivery nn
Design nn
Construction nnDocuments nn
Procurement nn(Bidding/Negotiating/Purchasing) nn
Construction nn
Facility nnManagement nn
nn
Project nnConception nn- nnCORRECT nnANSWER-Transforms nnthe nnneeds nnof nnowner
nninto nnclear nn
nn
concept nnon nnwhich nnproject nncan nnbe nndesigned. nnFeasibility nnStudy,
nnProgramming, nnSite
nn
Selection,
nnBudgeting.
nn
,Project nnDelivery nn- nnCORRECT nnANSWER-Determine nndelivery nnmethod nnto nnbe nnused.
nnFactors nn
nn
- nnqualifications, nnexperience, nncapacity, nnproject nnextent, nntime
nnrequirements.
nn
Design nn- nnCORRECT nnANSWER-Two nnPhases: nnschematic nndesign nnand nndesign
nndevelopment. nnDeliverables nninclude nngraphic nnand nnwritten nndesign nndocuments nnand
nnestimates nnof nnproject nncost. nn
nn
Schematic nnDesign nn- nnCORRECT nnANSWER-Overall nnrelationships nnand nnfunctions.
nnSite nnplan nn
nn
and nnarea, nngeneral nnsize/shape/massing nnof nnelements, nnelevations nnand
nnexteriors
nn nn
established, nnconceptual nndesign nncriteria
nnidentified.
nn
Deliverables nn- nnschematic nndrawings, nnprobable nncost, nnpreliminary
nnschedules
nn
Design nnDevelopment nn- nnCORRECT nnANSWER-Technical nnissues nnof nnconstructibility
nnand nnintegration nnof nnsystems nnand nncomponents. nn nn
Deliverables nn- nnTech nninformation, nnoutline nnspecifications, nnupdated nnschedule,
nnupdated nncost nnestimate. nn
nn
Construction nnDocuments nn- nnCORRECT nnANSWER-Defined nnas nnthe nnwritten nnand
nngraphic nndocuments nnprepared nnor nnassembled nnby nnthe nnA/E nnfor nncommunicating nnthe
nnproject nndesign nnfor nnconstruction nnand nnadministering nnthe nnconstruction nncontract.
nnConstruction nndocuments nninclude nntwo nnmajor nntypes nnof nndocuments: nnProcurement
nndocuments nnand nnContract nndocuments. nn
nn
Procurement nn(Bidding/Negotiating/Purchasing) nn- nnCORRECT nnANSWER-
Acceptance nnof nn
nn
the nncontractor's nnbid nnor nnnegotiated nnsum nnand nnother nnconditions nnwill nnresult nnin
nnaward nnof nna
nn
contract nnand nncommencement nnof
nnwork.
nn
Construction nn- nnCORRECT nnANSWER-Responsibilities: nn
Contractor nn- nnperform nnwork, nnproject nncoordination, nncomply nnwith nnproject
nndocuments. nnA/E nn- nnconstruction nnadmin, nnevaluation nnservices, nncertify
nnapplication nnfor nnpayment, nnfinal nninspection nnof nnwork. nn nn
Owner nn- nnprovide nninformation, nnprocess nnpayments, nnapprove nncontract nnmodifications,
nnaccept nnproject nnupon nncompletion. nn
nn
Facility nnManagement nn- nnCORRECT nnANSWER-During nnoccupancy, nnowners nn&
nnfacility nn
, nn
managers nnmaintain nnand nnevaluate nnthe nnperformance nnof nnthe nnproject nnand
nndetermine
nn
suitability nnfor nncontinuing
nnuse.
nn
OmniClass nn- nnCORRECT nnANSWER-A nnmulti-table nninformational nnframework nnfor
nnorganizing nn
nn
information nnused nnby nnthe nnarchitectural, nnengineering, nnand nnconstruction
nnindustry.
nn
UniFormat nn- nnCORRECT nnANSWER-Uniform nnclassification nnsystem nnfor nnorganizing
nnpreliminary nnconstruction nninformation nninto nna nnstandard nnorder nnor nnsequence nnon nnthe
nnbasis nnof nnsystems nnor nnassemblies. nnParticularly nnuseful nnin nnconceptual nndesign.
nnElement nnIdentification. nn
nn
MasterFormat nn- nnCORRECT nnANSWER-Arranges nnrelated nnconstruction nnpractices,
nnlogical nn
nn
groupings nnof nnwork nnresults, nninto nna nnseries nnof nndivisions. nn50 nndivision nnformat.
nnUsed nnfor
nn
Specifications, nndata nnorganization, nnand nncost
nnclassification.
nn
MasterFormat nn Groups nn - nn CORRECT nn ANSWER-00 nn Procurement nn and
nnContracting nn
nn
Requirement
nnGroup
nn
Specifications nnGroup nn
- General nnRequirements nn01 nn
- Facility nnConstruction nnSubgroup nn(concrete) nn
- Facility nnServices nn(plumbing/HVAC) nn
- Site nnand nnInfrastructure nn(Earthwork) nn
- Process nnEquipment nn(WW nnequipment) nn
nn
SectionFormat nn- nnCORRECT nnANSWER-Provides nna nnuniform nnapproach nnto
nnorganizing nn
nn
specification nninformation nnby nnthree nnprimary nnparts. nnGeneral, nnProducts,
nnExecution
nn
Sustainable nnDesign nn- nnCORRECT nnANSWER-Environmental nnperformance nnof nnthe
nnfacility nn
nn
over nncourse nnof nnits nnlife nncycle. nnTakes nnplace nnat nnthe nnproduct nnand
nnfacility nnlevel.
nn
Environmental nn Design nn Tools -
nn nn CORRECT nn ANSWER-National nn Institute nn of
nnTechnology nn