NICET Highway Construction Inspector Level III (2025/2026) – Practice with Verified Questions and Answers This document provides verified practice questions and answers for the NICET Highway Construction Inspector Level III exam (2025/2026). It covers essential topics such as construction materials, inspection procedures, project documentation, safety standards, and regulatory compliance. Designed to support exam readiness, this resource ensures a thorough understanding of the knowledge required at Level III.

Mostrar más Leer menos
Institución
Nicet Level 2 Construction
Grado
Nicet Level 2 Construction

Vista previa del contenido

NICET HIGHWAY CONSTRUCTION
INSPECTOR LEVEL III PRACTICE
WITH VERIFIED QUESTIONS AND
ANSWERS 2025/2026
During installation of traffic loops in the pavement, which three statements apply prior to and during
the installation of loop wire? (Choose 3).



a) Do not allow vehicular traffic over an open saw cut.

b) Do not overlap saw cuts at the corner.

c) Thoroughly clean the saw cut of foreign material.

d) Use a plastic sleeve where loop wire crosses a joint. - CORRECT ANSWERS -a) Do not allow vehicular
traffic over an open saw cut.

c) Thoroughly clean the saw cut of foreign material.

d) Use a plastic sleeve where loop wire crosses a joint.



The contractor is installing a culvert with a 12-inch reinforced concrete pipe ( outside diameter of 16.50
inches) from Sta 10+00, 40 feet Left to STA 10+00, 65 feet Right on 4-inch bedding material. The 12-inch
RCP outlet is to be installed at Sta 10+00, 40 feet Left at an invert elevation of 652.50.



If the conduit is installed at a 1.40% slope, what is the elevation of the foundation grade at Sta 10+00, 45
feet Right?



a) 652.04

b) 653.17

c) 653.36

d) 653.50 - CORRECT ANSWERS -?

,On the reservoir side of a dam, erosion protection against wave action should extend up the slope to at
least which level?



a) crest of dam

b) maximum water elevation

c) minimum water elevation

d) two-thirds the height of the dam - CORRECT ANSWERS -b) maximum water elevation



During stage construction while installing drainage, the contractor must complete which two of the
following tasks? (Choose two).



a) Bulk head the pipe until the system is complete.

b) Complete the entire system before it rains.

c) Maintain the existing drainage system until the new system is functional.

d) Provide temporary connections as needed to maintain the existing system. - CORRECT ANSWERS -c)
Maintain the existing drainage system until the new system is functional.

d) Provide temporary connections as needed to maintain the existing system.



After flushing but before connecting a new main to the existing system, what test does an inspector
need to verify before placing the main into service?



a) bacteriological testing

b) cover testing

c) deflection testing

d) pressure testing - CORRECT ANSWERS -d) pressure testing

, Which three types of inspections are completed for sign structures? (Choose three).



a) final inspection

b) interim inspection

c) initial inspection

d) routine inspection - CORRECT ANSWERS -b) interim inspection

c) initial inspection

d) routine inspection



How many times per foot should loop lead-in wires be twisted?



a) 3 turns per foot

b) 5 turns per foot

c) 6 turns per foot

d) 7 turns per foot - CORRECT ANSWERS -b) 5 turns per foot



Which phrase is true of test reports required for concrete sidewalks, asphalt pavement, concrete curb,
and pipe culverts for rest areas?



a) 50% required on roadway contracts

b) required for federal-aid projects only

c) same as roadway contracts

d) submitted in duplicate - CORRECT ANSWERS -?



According to FP-14, when removing existing concrete structure in the roadbed, how many inches below
the subgrade elevation should the existing structure be removed to?

Escuela, estudio y materia

Institución
Nicet Level 2 Construction
Grado
Nicet Level 2 Construction

Información del documento

Subido en
27 de agosto de 2025
Número de páginas
19
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$18.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
HIGHWESTSCORES Liberty University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
37
Miembro desde
2 año
Número de seguidores
21
Documentos
493
Última venta
3 meses hace
YOUR PREMIER EXAM PREPARATION SPECIALIST

I am passionate and reliable in my work as a tutor, for all your assignments and questions on Various subjects, please don\'t hesitate to reach out to me. this page contains updated exam solution .I offer high quality documents ( Testbanks ,assignments, exams and case studies.)In various fields of study that are up to date and highly rated. I am ambitious and driven, my documents are 100% guaranteed to help you excel in your studies Am an expert on major courses especially; Psychology, Nursing, Mental health, Statistics, Human Resource Management and Mathematics Assisting students with quality work is my first priority. May you Prosper in your field of studies.Excellent homework help and tutoring ,all kind of questions and exam with guaranteed grade A+

Lee mas Leer menos
3.8

4 reseñas

5
2
4
1
3
0
2
0
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes