Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 24 páginas
Examen

3rd Class Stationary Steam Engineer License (2025/2026) – Verified Questions and Answers

Document preview thumbnail
Vista previa 3 fuera de 24 páginas

3rd Class Stationary Steam Engineer License (2025/2026) – Verified Questions and Answers This document contains verified questions and answers for the 3rd Class Stationary Steam Engineer License exam (2025/2026). It is designed to help candidates prepare effectively by covering essential concepts, safety regulations, operational procedures, and troubleshooting scenarios. With accurate solutions, this resource ensures clear understanding and targeted exam preparation.

Vista previa del contenido

3RD CLASS STATIONARY STEAM
ENGINEER LICENSE WITH VERIFIED
QUESTIONS AND ANSWERS
2025/2026
_________ are necessary for complete combustion - CORRECT ANSWERS -time, temperature, mixture,
and atomization



if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - CORRECT ANSWERS -
214.7



a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The
blowdown is______psi - CORRECT ANSWERS -12



an oil cooler is commonly used with a(n) ________ when operating in conjunction with a turbo-
generator - CORRECT ANSWERS -steam turbine



a boiler is producing 40,000lb of steam/hr at a pressure of 100 PSI and a steam temperature of 500
degrees Fahrenheit. The steam produced is _______ steam - CORRECT ANSWERS -superheated



the economizer on a boiler is used to _______ - CORRECT ANSWERS -add heat to the feed water



blowers are normally used with________ boilers - CORRECT ANSWERS -water tube



overheating of tubes on a boiler can be caused by________ - CORRECT ANSWERS -scale on tubes



carbon dioxide in a condensate return system causes_________ - CORRECT ANSWERS -channeling

,a ________ pump is a positive displacement pump - CORRECT ANSWERS -reciprocating



a boiler generating 6000 lb of steam/hr produces _______btu/hr - CORRECT ANSWERS -6,000,000



a bottom blowdown is performed on a boiler to _____ - CORRECT ANSWERS -discharge sludge and
sediment



water columns are connected to the boiler with a minimum of _______" pipe - CORRECT ANSWERS -1



the minimum size of a water column blowdown valve is_______". - CORRECT ANSWERS -3/4



the maximum size bottom blowdown valve on a boiler is_________". - CORRECT ANSWERS -2 1/2



a ________ allows condensate to pass through, but stops Steam. - CORRECT ANSWERS -a steam trap



when taking over a shift, the first thing to do is check the________ - CORRECT ANSWERS -water level in
each boiler



according to the asme code, a high-pressure boiler having more than 500 square feet of heating surface
shall have________ - CORRECT ANSWERS -two or more safety valves



the probable cause of an increase in temperature of gases of combustion at the boiler Outlet is____ -
CORRECT ANSWERS -dirty heating services



boilers in battery equipped with________ must have two main steam stop valves and a free-flowing
drain between them - CORRECT ANSWERS -manhole openings

, in order to be sure the gauge glass is indicating an accurate water level reading, the stationary engineer
should______ - CORRECT ANSWERS -blowdown the gauge glass



a continuous blowdown line is located___ - CORRECT ANSWERS -in the Steam and water drum well
below the nowl



a temperature reading of 80 degrees Celsius is equal to_________°f - CORRECT ANSWERS -176



a chimney temperature of 250 degrees Fahrenheit above steam temperature indicates_______ -
CORRECT ANSWERS -poor efficiency



a manometer is red in________ - CORRECT ANSWERS -inches of water



the boiling point of water will____ with an increase in pressure - CORRECT ANSWERS -be raised



if a lather is not obtained when performing a soap hardness test, the water sample is_______ - CORRECT
ANSWERS -hard



combustion efficiency can be increased when air is________ - CORRECT ANSWERS -preheated



______ draft is produced by a fan located between the boiler and the chimney - CORRECT ANSWERS -
induced



the overspeed trip on a steam turbine should be tested ______ - CORRECT ANSWERS -before putting the
steam turbine on-line

Información del documento

Subido en
27 de agosto de 2025
Número de páginas
24
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$15.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
HIGHWESTSCORES
3.8
(4)
Vendido
41
Seguidores
21
Artículos
490
Última venta
1 mes hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes