100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

Solution Manual for Project Management in Practice 7th Edition by Jack R. Meredith |ISBN: 9781119702962| Guide A+

Puntuación
-
Vendido
-
Páginas
226
Grado
A+
Subido en
25-08-2025
Escrito en
2025/2026

Solution Manual for Project Management in Practice 7th Edition by Jack R. Meredith |ISBN: 9781119702962| Guide A+

Institución
Project Management In Practice
Grado
Project Management in Practice











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Libro relacionado

Escuela, estudio y materia

Institución
Project Management in Practice
Grado
Project Management in Practice

Información del documento

Subido en
25 de agosto de 2025
Número de páginas
226
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

@PROFDOCDIGITALLIBRARIES




SOLUTION MANUAL
TE
Project Management in Practice, 7th Edition by Meredith
STB
A N
KS
Chapter 1-8


Chapter 1
The World of Project Management
O

This chapter introduces the topic of project management. Projects are defined as temporary
LU
endeavors undertaken to create a unique product or service. The chapter points out that
recent interest in project management is based on a recognition that many organizational tasks
do not fit neatly into business-as-usual. The significant differences between project
management and general management are overviewed. The chapter points out that the two
primary roles of the project manager are managing trade-offs among the three interrelated
TI
project objectives and managing risk. The three interrelated objectives of budget, schedule,
and specifications are also introduced. In addition, two alternative project life cycles are
presented and the importance of understanding this distinction is discussed. Also included in
O
the chapter is a discussion of project selection including both non-numeric and numeric
selection methods. The chapter concludes with a discussion of the aggregate project plan and
an overview of the organization of the remainder of the text.
N
Cases and Readings
S
Some cases appropriate to the subject of this chapter are:

, @PROFDOCDIGITALLIBRARIES

Harvard: 9-688-040 Boeing 767: From Concept to Production (A); 9-688-041 (B) 9-888-519
Videotape. This 19 page best-selling case shows how a massive corporation manages the
evolution of an enormously complex and risky project from conception to manufacture. The 1-
TE
page B case is a supplement update about whether Boeing needs to change the way they
manage such projects. The video shows the assembly process of an airplane, compressing 10
weeks of work into ten minutes. Good introductory case to the idea of large-scale projects. An
18 page teaching note is available for this case (9-689-027).
S
Harvard: 9-396-311 BAE Automated System (A): Denver International Airport Baggage-
Handling System. This 15-page case describes the difficult, continually-delayed Denver airport
TB
project from the viewpoint of one of the contractors. Includes issues of budgeting, scheduling,
planning, contracting, and other managerial aspects of this large project. There is also a (B)
case, described in Chapter 7: Monitoring and Controlling the Project. A 32 page teaching note is
available for this case (5-399-099).
A N
KS
O
LU
TI
O
N
S

, @PROFDOCDIGITALLIBRARIES


Harvard: 9-692-083 BMW: The 7-Series Project (A); 9-695-013 (B). This 20-page best-selling
case describes the situation of a manufacturer with a high-quality product trying to select
among two processes for producing its new model. The proposed project for initiating a new
TE
production process promises to eliminate start-up production problems and improve quality
but may be less flexible for downstream product improvements. A 13 page teaching note is
available for this case (5-692-094).
Harvard: 9-689-073 Plus Development Corp. (B) (Abridged); 9-693-064 (C). These two cases,
S
normally meant to follow the (A) case (see Chapter 2), describe the need for this corporation to
select between alternative methods of product development. The situation is exacerbated by
competitors’ aggressive actions in the market and mixed results with current development
TB
procedures. A 21 page teaching note is available(5-690-093).

Some readings appropriate to the subject of this chapter are:

J.K. Pinto et al. Lessons for an Accidental Profession (Business Horizons, March-April 1995).
A
This reading describes the common occurrence of someone suddenly being appointed a project
manager and finding he or she has been inadequately trained for the task. Based on the
N
authors’ own experiences and interviews with dozens of senior project managers, they distill
twelve guidelines for new project managers. The guidelines run the gamut from project
KS
initiation, through planning, to execution, to close-out. Some are technical, some are
uncommon sense, and many are philosophical, and sometimes political. But they are sage
advice, not only for the novice but for the experienced project manager as well.

1. Cooke-Davies (2002). The real success factors on projects (International Journal of
O
Project Management, vol. 20, #3, pp 185-190).
This reading uses three questions to question on which factors are critical to project
success. The questions are: ‘‘What factors lead to project management success?’’,
LU
‘‘What factors lead to a successful project?’’ and ‘‘What factors lead to consistently
successful projects?’’ This paper is based on empirical research from more than 70 large
multi-national or national organizations It i identifies 12 factors that are, in one way or
another, critical to project success.
2. Thomas, G & Fernández, W. (2008), Success in IT projects: A matter of definition?
TI
(International Journal of Project Management, 26, 733-742). This reading investigates
how project management success is defined and measured within companies in
different industries. The study was done in Australia and provides an international
O
perspective on project success. The authors suggest that when success criteria are
formally defined and then measured, IT project outcomes are improved and project
resources are better utilized.
N
S

, @PROFDOCDIGITALLIBRARIES



Answers to Review Questions
TE
1. What is the primary role of a project manager? How are the primary roles related to one
another?

The primary roles of the project manager are managing the tradeoffs among the three
S
project goals (cost, scope, time) and managing risk. The primary roles are related to one
another in that to some extent they can be traded-off for one another. For example,
managing risk is about managing uncertainty. One uncertainty is whether the project will
TB
be completed on time. One way to manage the uncertainty associated with the project
being completed on time is to pad the project due date.

2. Contrast a project from a nonproject.
A
The difference between a project and a nonproject is not always crystal clear. At base,
however, projects are unique, have a specific deliverable, and have a specific due date while
N
nonprojects usually do not have all these characteristics.

3. Contrast win-lose negotiation, lose-lose negotiation and win-win negotiation and explain
KS
why the latter is so important in project management.

Win-lose negotiation is like a zero-sum game. Anything one side wins is a loss for the other
side. In win-win negotiation, the outcome is such that both parties gain something from the
interchange.
O
Win-lose negotiating is dangerous for project managers who will have to deal with the same
parties over and over again. The project manager who forces a functional manager to lose
LU
will have created a permanent enemy.

4. Identify the three goals of a project. What does it mean for a project to be
“overdetermined?”
TI
The three goals of a project are:

1. On time,
O
2. On budget, and
3. To specification (i.e., including “quality” and “client satisfaction”).
N
An overdetermined project is one that has a fixed budget, fixed delivery time, and fixed
specifications (i.e., all three goals are fixed). In reality, projects must have some flexibility to
allow for chance events. In the case of an overdetermined project, there is no allowance for
S
any such events.
$20.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TestbankSolutions Johns Hopkins University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
50
Miembro desde
1 año
Número de seguidores
2
Documentos
253
Última venta
3 meses hace
Welcome to Your Ultimate Study Resource!!!

Struggling to keep up with your coursework? Looking for high-quality, reliable study materials to boost your grades? You’ve come to the right place! At TestbankSolutions on Stuvia, I provide carefully crafted, exam-ready notes, summaries, and study guides for students who want to save time and succeed with confidence. All materials are written with clarity, accuracy, and structure in mind — perfect for last-minute revision or deep understanding. Why Choose My Shop? Clear and concise summaries Covers key concepts and exam questions Easy-to-follow structure for efficient revision Trusted by hundreds of happy students Affordable and instantly downloadable Subjects Covered: Business, Psychology, Law, Nursing, etc. Don’t waste hours scrolling through textbooks or stressing before exams — get the tools you need to study smarter, not harder. Check out the reviews and see why students keep coming back!

Lee mas Leer menos
5.0

2 reseñas

5
2
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes