NCCCO tower crane exam practice with 100% correct answers
NCCCO tower crane exam practice with 100% correct answers Splices in rall tracks shall have - Correct Answer Smooth Joints Hydraulic systems should have their proper fluid level checked - Correct Answer Daily If power fails during operations, the following shouldn't apply - Correct Answer Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - Correct Answer Person responsible for lift Where should climbing instructions be kept - Correct Answer ON Site All climbing operations shall be performed under the supervision of - Correct Answer Qualified person When cranes are erected, load limiting devices shall be tested for proper setting and operation - Correct Answer Before crane is placed in service
Escuela, estudio y materia
- Institución
- NCCCO
- Grado
- NCCCO
Información del documento
- Subido en
- 23 de agosto de 2025
- Número de páginas
- 14
- Escrito en
- 2025/2026
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
splices in rall tracks shall have
-
hydraulic systems should have their proper fluid l
-
if power fails during operations the following sh
-
if load is undetermined who is to find out if load
Documento también disponible en un lote