Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 7 páginas
Examen

GE 5103 Week 7 Quiz | Questions and Answers |2025 Update | 100% Correct.

Document preview thumbnail
Vista previa 2 fuera de 7 páginas

GE 5103 Week 7 Quiz | Questions and Answers |2025 Update | 100% Correct.

Vista previa del contenido

Your customer has approached you and told you that you now need to finish the
project two weeks earlier than anticipated. What does this mean in terms of the
critical path?


A You have a project float of two weeks.


B Your project will be delayed by two weeks.


c You have a positive float of two weeks.


D You have a negative float of two weeks.



m In which of the following methods do team members pull the work from a queue?


A Critical path method


X B Iterative scheduling with a backlog


C On-demand scheduling


D Resource leveling


Your initial plan was to finish all configuration work before testing would start.
However, due to some delays, you have decided to start testing even though
configuration is not yet complete. Which of the following would best describe this
situation?


You have changed a mandatory dependency to a discretionary
dependency.


B You have changed a finish to start to a start to start relationship.


c You have changed a start to finish relationship to a finish to start.


D You have changed soft logic to hard logic.

, 1’ You need to clear a parking lot covered in snow and decide one person should
start clearing the snow before the other person starts putting down rock salt.
What relationship does this best describe?


A Start to start


B Finish to finish


c Start to finish


X D Finish to start


Which of the following scheduling tools would you use on an agile project?
(Choose two.)


A Critical path method


B Iterative schedule with a backlog


c On-demand scheduling


D Three-point estimating


E Bottom-up estimating


|* You are the manager on a project to build a new wing for the local hospital. The
ribbon-cutting ceremony is set, and many high-profile local dignitaries will be
present, so the deadline is set firm and approaching fast. Unfortunately, the project
is behind schedule. You work with your customer to discuss the best way to bring
the project back on track, and the customer decides to crash the schedule. Of the
following, which is the greatest concern to you?


A Getting approval from the change control board


/B Finding the additional resources to perform the work


C Stakeholder’s buy-in


D Increased cost

Información del documento

Subido en
19 de agosto de 2025
Número de páginas
7
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$15.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Wiseman
3.9
(1639)
Vendido
8170
Seguidores
3893
Artículos
30517
Última venta
2 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes