100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

FDOT Earthwork Level 1 Exam with Verified Answers

Puntuación
-
Vendido
-
Páginas
5
Grado
A+
Subido en
19-08-2025
Escrito en
2025/2026

Basics covered in Level 1 - ANSWER - Nuclear Testing Speedy Moisture Report Forms Earthwork has to do with the roadway in what way? - ANSWER -Earthwork is the excavation and placement of soils and materials supporting the proposed roadway. In Earthwork what is a lift? - ANSWER -6" of compacted depth at full width In Earthwork what is a Lot? - ANSWER -A lot is 1 lift at 500 ft or within compacted area. Isolated compaction operations are separate lots. Sampling at the roadway is done for - ANSWER -Done for base, sub grade, and embankme

Mostrar más Leer menos
Institución
FDOT Earthwork Level 1
Grado
FDOT Earthwork Level 1









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
FDOT Earthwork Level 1
Grado
FDOT Earthwork Level 1

Información del documento

Subido en
19 de agosto de 2025
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

FDOT Earthwork Level 1 Exam with Verified Answers
Basics covered in Level 1 - ANSWER -
Nuclear Testing Compaction causes - ANSWER -An
Speedy Moisture increase in unit weight, decrease in
Report Forms compressibility and permeability.


Earthwork has to do with the roadway in what The proctor is determined where and creates
way? - ANSWER -Earthwork is the what - ANSWER -In a laboratory and
excavation and placement of soils and materials establishes a density standard to be used on the
supporting the proposed roadway. roadway


In Earthwork what is a lift? - ANSWER -6" Lab proctors are created how - ANSWER -
of compacted depth at full width Material is gathered from the road and prepared
with different amounts of water then placed in
molds and hammered
In Earthwork what is a Lot? - ANSWER -A
lot is 1 lift at 500 ft or within compacted area.
Isolated compaction operations are separate What is a modified proctor used in -
lots. ANSWER -It is used in base, sub grade,
MSE wall back fill materials

Sampling at the roadway is done for -
ANSWER -Done for base, sub grade, and Modified proctors are created how -
embankment. ANSWER -With a 10lb hammer(rammer) on
a 18" drop with 56 blows per layers with 5 layers
in total.
Sampling is determined how - ANSWER -
generated with random numbers usually by a
Verification Inspector What is a standard proctor used in -
ANSWER -It is used in embankment and
structure back fill materials
What is important about sampling at the roadway
- ANSWER -Minimum of three
representative sample combined. Standard proctors are created how -
ANSWER -With a 5.5lb hammer(rammer)
on a 12" drop with 25 blows per layer with 3
What is LIMS? - ANSWER -Laboratory Info layers in total
Management System

Comparison between VT and QC density test
The proctor theory is when compaction is tolerance - ANSWER -2 lbs/pcf
achieved how - ANSWER -by inputting
energy to expel air and water in the soil voids
What is the STRG - ANSWER -Sampling,
1/5

, FDOT Earthwork Level 1 Exam with Verified Answers
Testing, and Reporting Guide (state wide) Location


A job guide schedule is - ANSWER -project What is the document that itemizes the minimum
specific requirements for sampling and testing? -
ANSWER -Sampling, testing, reporting
guide
The material identification number for
embankment in the laboratory is -
ANSWER -004L Unit weight is - ANSWER -the weight of a
material occupying a volume

The material identification number for
embankment in the field is - ANSWER - Wet density - ANSWER -is the weight of
004F soil and water in a volume


The material identification number for base is - Dry density - ANSWER -weight of soil solids
ANSWER -030 in a volume


PP is short for - ANSWER -project personel Moisture content - ANSWER -amount of
water in the soil in the volume

Sampling in the field it is important to -
ANSWER -sample each type of material How does moisture react with soil -
and have enough for a representative sample ANSWER -acts as a lubricant permitting
maximum densification

When to secure samples - ANSWER -After
material is placed but before compaction effort is Compaction expels air and water causing -
applied ANSWER -Increase in unit weight
and
Decrease in compressibility and permeability
Sample transmittal card the source uses what (ability of water to flow through)
code for the jobsite - ANSWER -08

MSE wall stands for - ANSWER -
For material description the minimum is always - Mechanically stabilized earth wall
ANSWER -Color and texture

FM 1 T-80 refers to which proctor -
On sample bags be sure to put - ANSWER -Modified
ANSWER -Project #
Sample #
2/5
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
learndirect Liberty University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
45
Miembro desde
1 año
Número de seguidores
10
Documentos
3339
Última venta
1 mes hace
Learndirect

Here You will All Documents, and Package Deal Offered By Seller Learndirect.

3.3

6 reseñas

5
3
4
0
3
1
2
0
1
2

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes