100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

CSE 360 – Final ACTUAL Exam Questions and CORRECT Answers

Puntuación
-
Vendido
-
Páginas
18
Grado
A+
Subido en
19-08-2025
Escrito en
2025/2026

CSE 360 – Final ACTUAL Exam Questions and CORRECT Answers Which is not true? The software crisis identified that software is delivered a) over-budget b) incrementally c) late d) with too many remaining erros - CORRECT ANSWER b (incrementally) In scrum, who is responsible for removing any impediments that are obstructing the te

Mostrar más Leer menos
Institución
CSE
Grado
CSE










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CSE
Grado
CSE

Información del documento

Subido en
19 de agosto de 2025
Número de páginas
18
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CSE 360 – Final ACTUAL Exam Questions
and CORRECT Answers
Which is not true? The software crisis identified that software is delivered
a) over-budget
b) incrementally
c) late

d) with too many remaining erros - CORRECT ANSWER b (incrementally)


In scrum, who is responsible for removing any impediments that are obstructing the team from
achieving its sprint goals?
a) Team members
b) product owner
c) scrum master

d) customer - CORRECT ANSWER c (scrum master)


Software deteriorates rather than wears out because
a) software suffers from exposure to hostile environments.
b) defects are more likely to arise after software has been used often.
c) multiple change requests introduce errors in component interactions.

d) software spare parts are harder to order. - CORRECT ANSWER c (multiple change
requests introduce errors in component interactions)


A stakeholder is
a) anyone developing the project
b) the same as a user
c) anyone who has a vested interest int he success of the project

d) the same as a customer - CORRECT ANSWER c (anyone who has a vested interest in the
success of the project)

,Which is not one of the questions answered by each team member at each daily scrum meeting?
a) what did you do since the last meeting?
b) what obstacles are you encountering?
c) what is the cause of the problems you are encountering?

d) what do you plan to accomplish by the next team meeting? - CORRECT ANSWER c (what
is the cause of the problems you are encountering)


The critical path
a) contains the fewest number of tasks
b) is the shortest time from the start of the project to the end
c) determines the total calendar time required to complete a project

d) contains the largest number of tasks - CORRECT ANSWER c (determines the total
calendar time required to complete a project)


Which of the following is NOT a configuration management activity?
a) change management
b) performance assessment
c) version management

d) system building - CORRECT ANSWER b (performance assessment)


In version control, which of the following is a sequence of versions of source code?
a) repository
b) release
c) codeline

d) baseline - CORRECT ANSWER c (codeline)


The software engineering code of ethics states that a professional software engineer should be
committed to lifelong learning

, a) True

b) False - CORRECT ANSWER a (true)


Which of the following type of version control system creates a clone of the project repository?
a) agile
b) file controlled
c) centralized

d) distributed - CORRECT ANSWER d (distributed)


In configuration management storage management, keeping a difference between one version
and other rather than making a complete copy is called
a) a difference copy
b) a source translation
c) a delta

d) a clone - CORRECT ANSWER c (a delta)


Which of the following is not a common trait in the software processes?
a) design and implementation
b) evolution
c) specifications
d) incremental development

e) validation - CORRECT ANSWER d (incremental development)


Which is the best type of project to apply the waterfall model?
a) requirements are well defined and will not change
b) the customer cannot clearly define the requirements
c) a great deal of risk is involved
$11.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
MGRADES Stanford University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1078
Miembro desde
1 año
Número de seguidores
102
Documentos
68972
Última venta
1 día hace
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

171 reseñas

5
73
4
30
3
46
2
8
1
14

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes