Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

Residential Contractor Tennessee (2025) EXAM QUESTIONS AND ALL CORRECT ANSWERS 100% SOLVED AND GUARANTEED SUCCESS!!

Puntuación
-
Vendido
-
Páginas
34
Grado
A+
Subido en
19-08-2025
Escrito en
2025/2026

Residential Contractor Tennessee (2025) EXAM QUESTIONS AND ALL CORRECT ANSWERS 100% SOLVED AND GUARANTEED SUCCESS!!

Institución
Residential Contractor Tennessee
Grado
Residential Contractor Tennessee

Vista previa del contenido

Residential Contractor Tennessee
(2025) EXAM QUESTIONS AND ALL
CORRECT ANSWERS 100% SOLVED AND
GUARANTEED SUCCESS!!
The bucket's maximum capacity when the material is heaped above the edges of
the bucket is - (answers)heaped



The contents of the bucket when it is filled to the level of the rim. No material is
heaped over the rims, is - (answers)struck



Struck capacity is - (answers)level



Heaped capacity is - (answers)above the rim



How is a load factor calculated - (answers)bank volume / bank volume + swell
percentage



Co. vol. = - (answers)L x W x D / 27



What is the advantage of a U-blade versus a Semi-U blade? - (answers)holds more
material (40%)

,What piece of equipment is a good choice if you have a wide trench with no
crosslines? - (answers)Sheeps foot roller



The later the pipe diameter, the smaller the fall requirement is needed to
maintain a water velocity great enough to prevent - (answers)solids from settling
out



A ____________ stake is a small stake driven into the ground to identify a
particular reference point. - (answers)hubs



If a reference stake is 20.2' from the Hub and fill is to be started at a distance of
12.4' from the Hub, how are these distances measured? - (answers)both
horizontal



What percent slope rises at a 45 degree angle? - (answers)100%



Excavate _______ trenches around a tree deep enough to cut through the root
system of the tree. - (answers)4



________ is the easiest type of rock to rip. - (answers)rippable sedimentary



The level of the groundwater is known as the ________. - (answers)water table



Well points work well in ________ soils. - (answers)course grain or sandy

,How do you calculate time to excavate a set? - (answers)Divide the volume of dirt
in the set by the dirt moved per cycle; multiply the number of digging cycles by
the average cycle time



When dirt is moved form its natural state, this is called ________ or loose
condition. - (answers)swell or spoils or loose volume



What is the purpose of a tench box? - (answers)to support a wall of soil



The trench box must be centered over the pipe. To maintain safety, the maximum
height above the pipe to install the trench box is ________. - (answers)5' above
pipe



________ is the best piece of equipment for working in mud or soft ground. -
(answers)tract backhoe



________ is the method for testing soil density and does not require drilling. -
(answers)nuclear density test



________ is the easiest compaction method. - (answers)puddling or wetting the
soil



Limited working room in excavations means ________. - (answers)you can't easily
use the water necessary for wetting

, To estimate earthwork, you need to ________. - (answers)divide the area in
sections



The term subgrade identifies ________. - (answers)the surface elevation prior to
placing any surface material



The curving broken lines on a grading plan are ________ lines. - (answers)contour



Widely spaced differing contour lines indicate ________ on a grading plan. -
(answers)flatter area



Any self-loading scraper will be more productive in muddy soil when assisted by a
________. - (answers)dozer pushing on the push blocks at the rear of the bowl



What is the hardest part of grader's work? - (answers)finish blading



What type of dozer is used for fine grading, trench backfilling, landscaping, light
logging, and swamp dozing? - (answers)light utility dozer



If the operator fails to lift, tilt, and angle the blade just ________. - (answers)most
of the load is lost

Escuela, estudio y materia

Institución
Residential Contractor Tennessee
Grado
Residential Contractor Tennessee

Información del documento

Subido en
19 de agosto de 2025
Número de páginas
34
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$16.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor
Seller avatar
ExamVault

Conoce al vendedor

Seller avatar
ExamVault Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
33
Miembro desde
1 año
Número de seguidores
1
Documentos
253
Última venta
5 meses hace

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes