answered passed
1. Valley Service
7501 Tyrone
Plan- ning Office
Avenue Van Nuys,
Location
CA 91405
2. Metropolitan
Ser- vice Planning Lincoln Heights
Office Location 2633 Artesian
Street
3. Customer Los Angeles, CA 90031
Station Design
Group Loca- tion Lincoln Heights
2633 Artesian
4. Tract Design Street
Group Location Los Angeles, CA 90031
Lincoln Heights
5. Telecommunic 2633 Artesian
a- tions Group Street
Location Los Angeles, CA 90031
JFB
111 N. Hope Street
Los Angeles, CA
90031
6. Areas served by SCE 1. San Fernando
2. Beverly Hills and West Hollywood
3. Veterans Administration
4. Marina Del Ray
5. Universal Studios
7. Valley Service Bound- ary
Plan- ning Office
,LADWP ESR Book Section 1 questions well
answered passed
8. Metropolitan Addresses on Mulholland Drive & west of Hollywood freeway
Ser- vice Planning between Mul- holland Drive and Barham Blvd.
Office Boundary
Addresses on Barham Blvd. & East of Hollywood Freeway between
Mulholland Drive and Barham Blvd.
,LADWP ESR Book Section 1 questions well
answered passed
9. What must be 1. A complete Service Planning Information sheet (Pg. 1-19) for
pro- vided by master copy.
the cus- 2. Electrical Plans including load schedules, single-line diagrams,
and equip-
tomer when submit- ment elevation drawings.
ting plans?
13. The Dept will en- ergize a customer's
electric service only after?
10. What
documents will
the dept pro-
vide after
submit- ting
plans?
11. Who must the
cus- tomer
contact to make
an application
for electric
service?
12. When will
construc- tion be
started or service
established?
, LADWP ESR Book Section 1 questions well
answered passed
3. Plot grading, elevation, and Fees Include: application fee, charges for temporary services,
site improvement plans. charges for construction or relocation of Dept Facilities, charges for
4. Any addition information line extensions or ex- cess conductor allowances, charges for
requested by the service planner interconnection or customer-owned generation facilities and
needed to assist department in charges for nonstandard installations.
finalizing the customer's plans.
1. An electrical permit is obtained by the customer from the
Underground Projects: permitting agency.
Construction drawing or other 2. All site electrical wiring must be completed and inspected by the
documentation speci- fying the permitting agency and the final electrical release cleared to the
facilities that the customer must dept.
install on the customer's 3. All facilities specified by the dept must be inspected by the
premises to accommodate the dept and all
dept.'s transformers, cables, and
any other equipment needed to
supply customer load
Overhead Projects: Written
confirmation of the serving pole
and its location. Customer
Service Branch Oflce (pg. 1-
8)
After customer pays in full for
all fees and charges assessed
by the dept. (pg. 1-8)