1 BTU/ h = (Power) - ANS 0.293 W 1 BTU = (Energy) - ANS 1055 J 1 US gallon =?L - ANS 3.7854 liters (R-value) 1 R = - ANS 5.678 RSI Metric Thermal Resistance is... - ANS RSI Value Imperial Thermal Resistance is... - ANS R-value 1 L/s = ? cfm - ANS 2.12 2 strategies for addressing surface & groundwater that comes into contact with foundation walls? - ANS 1. Wall drainage interconnected to compatible drainage system to prevent accumulation of water (exterior drainage and damp proofing) 2. Full and continuous barrier to water penetration (waterproofing) Air Barrier must have a tested air leakage of ? at a pressure difference of ? - ANS 0.2L/sm2, 75 Pa Vapour Barrier must have a permeance level of less than ? - ANS 60ng (Pa sm2) What are the 4 main points of ERV? - ANS 1. Exchanges heat and moisture from exhaust stream 2. Requires frost protection in cold climates 3. More expensive than HRV 4. No condensation drain needed What are the 4 main points of HRV? - ANS 1. Supply & exhaust should be measured and balanced 2. Can be separately deducted; exchanges heat during winter & summer 3. Requires Drain pan for condensation 4. Brings in unwanted humidity in summer What are EIFS always applied OVER? - ANS Water-resistive barrier What are the main components of EIFS? - ANS 1. Insulation boards 2. Base coat with reinforcement 3. Surface Finish (joint treatments, drainage accessories, seals and sealants also form part of the system.) Heating Degree Days (HDD) - ANS Measurement designed to quantify the demand for energy needed to heat a building. HDD is derived from measurements of outside air temperature. The heating requirements for a given building at a specific location are considered to be directly proportional to the number of HDD at that location. Example 1: The high temperature for a particular day was 90°F and the low temperature was 66°F. The temperature mean for that day was: ( 90°F + 66°F ) / 2 = 78°F Because the result is above 65°F: 78°F - 65°F(18C) = 13 Cooling Degree Days Example 2: The high temperature for a particular day was 33°F and the low temperature was 25°F. The temperature mean for that day was: ( 33°F + 25°F ) / 2 = 29°F Because the result is below 65°F: 65°F - 29°F = 36 Heating Degree Days. Describe outdoor design temperature - ANS For a 99 percent winter design temperature, the outdoor temperature is colder than the design temperature for only one percent of the hours in a year on average or about 88 hours per year What causes air infiltration? - ANS Discontinuity in the air barrier system What is transmission heat loss? - ANS heat loss by conduction through building envelope components q= U*A(Tin-Tout) What is the outdoor design temperature? a) The lowest possible temperature that can be expected during a winter. b) The temperature below which heating equipment starts supplying heat. c) The temperature below which heating equipment cannot meet indoor temperature set-points. d) The temperature at which heating equipment should be operating at peak efficiency. - ANS C: The temperature below which heating equipment cant meet indoor temperature set- points What is heating load? - ANS the power [kW or Btu/h] required to maintain indoor temperature set-points associated with given outdoor conditions. A calculated heat load does not need to include the impact of a structure's thermal mass The 7 Main Advantages to EIFS are: - ANS 1. Continuity of Thermal Barrier 2.Lightweight 3. Water Penetration Resistance 4. Flexibility 5. Appearance 6. Reparability 7. Retrofit Applications How does the weight of EIFS compared to masonry or concrete cladding make them beneficial? - ANS They have a lower weight (dead load) which reduces structural costs, particularly where seismic loads influence design requirements. What 3 parts are most at risk for rainwater penetration? (EIFS) - ANS 1. Joints 2. Interfaces with other materials 3. Where lamina is damaged or defective What are some reasons that lightweight EIFs often applied directly over existing cladding systems? - ANS 1. Improves Appearance 2. Increases Thermal Performance 3. Improves Resistance to condensation or entrapped moisture 4. Corrects problems caused by rain penetration 5.Protects structure & existing cladding from deterioration What are the 6 main disadvantages to EIFS? - ANS 1. Combustibility 2. Impact Resistance 3. Compatibility 4. Staining 5. Sensitivity to workmanship 6. Long-term performance Why are EIFS vulnerable to impact damage? - ANS Thin laminas. (In areas where impact damage is likely, an appropriately reinforced EIFS product must be used).

Vista previa del contenido

Foundations Exam Questions And
Answers




A
R
U
LA
C
O
D

,1 BTU/ h = (Power) - ANS 0.293 W

1 BTU = (Energy) - ANS 1055 J




A
1 US gallon =?L - ANS 3.7854 liters

(R-value) 1 R = - ANS 5.678 RSI




R
Metric Thermal Resistance is... - ANS RSI Value

Imperial Thermal Resistance is... - ANS R-value



U
1 L/s = ? cfm - ANS 2.12
LA
2 strategies for addressing surface & groundwater that comes into contact with foundation
walls? - ANS 1. Wall drainage interconnected to compatible drainage system to prevent
accumulation of water (exterior drainage and damp proofing) 2. Full and continuous barrier to
water penetration (waterproofing)

Air Barrier must have a tested air leakage of ? at a pressure difference of ? - ANS
C

0.2L/sm2, 75 Pa

Vapour Barrier must have a permeance level of less than ? - ANS 60ng (Pa sm2)
O


What are the 4 main points of ERV? - ANS 1. Exchanges heat and moisture from exhaust
stream
2. Requires frost protection in cold climates
D



3. More expensive than HRV
4. No condensation drain needed

What are the 4 main points of HRV? - ANS 1. Supply & exhaust should be measured and
balanced
2. Can be separately deducted; exchanges heat during winter & summer
3. Requires Drain pan for condensation
4. Brings in unwanted humidity in summer

What are EIFS always applied OVER? - ANS Water-resistive barrier

,What are the main components of EIFS? - ANS 1. Insulation boards
2. Base coat with reinforcement
3. Surface Finish
(joint treatments, drainage accessories, seals and sealants also form part of the system.)

Heating Degree Days (HDD) - ANS Measurement designed to quantify the demand for
energy needed to heat a building. HDD is derived from measurements of outside air
temperature. The heating requirements for a given building at a specific location are considered
to be directly proportional to the number of HDD at that location.




A
Example 1: The high temperature for a particular day was 90°F and the low temperature was
66°F. The temperature mean for that day was:
( 90°F + 66°F ) / 2 = 78°F




R
Because the result is above 65°F:
78°F - 65°F(18C) = 13 Cooling Degree Days

Example 2: The high temperature for a particular day was 33°F and the low temperature was



U
25°F. The temperature mean for that day was:
( 33°F + 25°F ) / 2 = 29°F
Because the result is below 65°F:
LA
65°F - 29°F = 36 Heating Degree Days.

Describe outdoor design temperature - ANS For a 99 percent winter design temperature,
the outdoor temperature is colder than the design temperature for only one percent of the hours
in a year on average or about 88 hours per year
C

What causes air infiltration? - ANS Discontinuity in the air barrier system

What is transmission heat loss? - ANS heat loss by conduction through building envelope
components q= U*A(Tin-Tout)
O


What is the outdoor design temperature?
D



a) The lowest possible temperature that can be expected during a winter.
b) The temperature below which heating equipment starts supplying heat.
c) The temperature below which heating equipment cannot meet indoor temperature set-points.
d) The temperature at which heating equipment should be operating at peak efficiency. - ANS
C: The temperature below which heating equipment cant meet indoor temperature set- points

What is heating load? - ANS the power [kW or Btu/h] required to maintain indoor
temperature set-points associated with given outdoor conditions. A calculated heat load does
not need to include the impact of a structure's thermal mass

, The 7 Main Advantages to EIFS are: - ANS 1. Continuity of Thermal Barrier
2.Lightweight
3. Water Penetration Resistance
4. Flexibility
5. Appearance
6. Reparability
7. Retrofit Applications

How does the weight of EIFS compared to masonry or concrete cladding make them beneficial?
- ANS They have a lower weight (dead load) which reduces structural costs, particularly
where seismic loads influence design requirements.




A
What 3 parts are most at risk for rainwater penetration? (EIFS) - ANS 1. Joints
2. Interfaces with other materials




R
3. Where lamina is damaged or defective

What are some reasons that lightweight EIFs often applied directly over existing cladding
systems? - ANS 1. Improves Appearance



U
2. Increases Thermal Performance
3. Improves Resistance to condensation or entrapped moisture
4. Corrects problems caused by rain penetration
LA
5.Protects structure & existing cladding from deterioration

What are the 6 main disadvantages to EIFS? - ANS 1. Combustibility
2. Impact Resistance
3. Compatibility
4. Staining
C

5. Sensitivity to workmanship
6. Long-term performance

Why are EIFS vulnerable to impact damage? - ANS Thin laminas.
O


(In areas where impact damage is likely, an appropriately reinforced EIFS product must be
used).
D



What can happen if EIFs are exposed to frequent wetting (rain or in high-humidity climates or
shaded areas without access direct sunlight? - ANS Staining from mildew growth can occur

What is the minimum service life for properly designed and applied EIFS? - ANS 30 years

What does amount of infiltration depend on? - ANS total area, types of cracks, pressure
differences, wind speeds, temperature differences

Información del documento

Subido en
9 de agosto de 2025
Número de páginas
35
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.89

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
DocLaura
4.2
(44)
Vendido
160
Seguidores
38
Artículos
6400
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes