100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

Exam (elaborations) Power systems Power System Analysis

Puntuación
-
Vendido
-
Páginas
22
Grado
A+
Subido en
08-08-2025
Escrito en
2025/2026

Exam (elaborations) Power systems Power System Analysis

Institución
Grado










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Libro relacionado

Escuela, estudio y materia

Grado

Información del documento

Subido en
8 de agosto de 2025
Número de páginas
22
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

BIT BANK 2024-25


SIDDARTHA INSTITUTE OF SCIENCE AND TECHNOLOGY
(AUTONOMOUS)
(Approved by AICTE, New Delhi & Affiliated to JNTUA, Ananthapuramu)
(Accredited by NAAC with “A” Grade & ISO 9001 : 2008 Certified Institution)

QUESTION BANK (OBJECTIVE)

Subject with Code : POWER SYSTEMS-I(23EE0213)
Course & Branch : II B. Tech & EEE
Year & Semester : I - B. Tech. & I - Semester Regulation : R23
UNIT –I
HYDROELECTRIC AND THERMAL POWER STATION


1 Which of the following is not a requirement for site selection of hydroelectric power plant?
A) Availability B) Large C) Rocky land D) Sediment [ ]
of water catchment ation
area
2 The amount of electrical energy that can be generated by a hydroelectric power plant
depends upon ___________ [ ]
A) Head of water B) Quantity of C) Specific D) Efficiency of
water weight of Alternator
water
Hydroelectric power plant is __________
3
[ ]
A) Non- B) Conventional C) Non- D) Continuous
renewable source of conventional source of energy
source of energy source of
energy energy
4 Hydroelectric power plant is mainly located in ____________
[ ]
A) Flat areas B) Deserts C) Hilly areas D) Deltas

Which of the following is not an advantage of hydroelectric power plant?
5
[ ]
A) B) low running C) continuous D) no standby losses
no fuel
cost power source
requirement


6 Which element of hydroelectric power plant prevents the penstock from water hammer
[ ]
phenomenon?
A) Valves B) Draft tubes C) Spillway D) Surge Tank
and
Gates
7 Dam having very wide base as compared to its height is called _________
[ ]
A) buttress dam B) arch dam C) earth dam D) solid gravity
dam

POWER SYSTEMS-I(23EE0213) Page 1

,8 Penstock in a hydroelectric power plant is _____________
[ ]
A) a pipe B) nozzle that C) a conduit D) a pipe
connected to release high connecting connecting surge
runner outlet pressure water forebay to tank to dam
on turbine turbine
blades
9 Trash racks are located ____________
[ ]
A) near tailrace B) at the entrance of C) inside D) intake
turbine penstock



10 What is the basic requirement of hydroelectric power station?
[ ]
A) Reservoir B) Turbine C) Power house D) Penstock

11 What is used to prevent the entry of debris into turbine?
[ ]
A) Wiper B) Fore bay C) Trash rack D) Filter

12 A pipe between surge tank and prime mover is known as? [ ]
A) Canal B) Draft tube C) Penstock D) Hose

13 A safety valve for a dam to discharge major floods is called? [ ]
A) Spillway B) Penstock C) Fore bay D) Canal

14 Which of the following is not a primary fuel used in a thermal power plant? [ ]
A) Coal B) Natural gas C) Nuclear fuel D) Solar energy

15 Which component of a thermal power plant converts heat energy into mechanical energy? [ ]
A) Boiler B) Turbine C) Condenser D) Generator

16 What is the role of a condenser in a thermal power plant? [ ]

A) To generate B) To increase C) To convert D) To condense the
electricity the temperature mechanical steam back into
of the steam energy into water
electrical
energy

17 The major heat loss in a steam power station occurs in [ ]
A) Economiser B) Spillways C) Condenser D) None of the
above
18 In thermal power plant, turbine is placed [ ]
A) before boiler B) in between C) after generator D) any of the above
boiler and
generator
19 In thermal power plants, the dust of flue gases is trapped by [ ]


POWER SYSTEMS-I(23EE0213) Page 2

, A) Precipitator B) Economizer C) Superheater D) Air preheater

20 The following is not a component of Thermal power plant [ ]
A) Condenser B) Cooling tower C) Turbine D) Fuel tank

21 The thermal efficiency of a steam power station is [ ]
A) 38% B) 28% C) 40% D) 45%


22 [ ]
The cost of fuel transportation is maximum in
A) Hydro-electric B) Steam power C) Nuclear power D) All
power plant plant plant

23 Which of the following are the components of a thermal power plant? [ ]

A) Boiler and B) Turbine and C) Condenser and D) All of these
Turbine Condenser Cooling tower

24 Which of the following components help to increase the efficiency of a boiler? [ ]

A) Safety valve B) Water level C) Steam stop valve D) Economizer
indicator

25 From where you should take the heat to increase the temperature of the air in the air [ ]
preheater?

A) Steam B) Water C) Ash D) Flue gas


26 Air-preheaters should be located in ____. [ ]

A) Exhaust flue B) Exhaust flue gas C) Within the D) In the steam path
gas path, path, after the furnace, in the
before the chimney emitting flue gas
chimney path

27 The purpose of installing the Air pre-heater and Economizer is ____. [ ]

A) To increase the B) To superheat the C) To remove the D) To extract the
temperature of steam particulate heat from the
the steam matters from the flue gas
flue gas

28 The height of chimney in a steam power plant is governed by........ [ ]
A) Flue gases B) The draught C) Control of D) Corner of power
quantity to be pollution plant
produced




POWER SYSTEMS-I(23EE0213) Page 3
$7.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
bhanumani

Documento también disponible en un lote

Conoce al vendedor

Seller avatar
bhanumani Residential
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
0
Miembro desde
4 meses
Número de seguidores
0
Documentos
8
Última venta
-

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes