To what accuracy should the scales for weighing cement , pozzolan, slag and aggregates at the plant be maintained - Answer -0.5% of maximum load normally handled For concrete containing a water-reducing retarding admixture, in an agitator truck, the maximum time for depositing the concrete shall not exceed: - Answer -90 minutes If a load of concrete has been rejected due to excessive slump, the concrete may remain in the transporting vehicle to reduce the slump. - Answer -Is not allowed. Who places the orders for concrete with the producer? - Answer -The contractor The minimum normal sampling frequency for the chloride content of structural concrete is: - Answer -1 per design mix in use from the first day of production and every 30 calendar days or less thereafter.

Mostrar más Leer menos
Institución
FDOT
Grado
FDOT








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
FDOT
Grado
FDOT

Información del documento

Subido en
7 de agosto de 2025
Número de páginas
4
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

FDOT CONCRETE BATCH PLANT OPERATOR EXAM
Stockpiles of aggregate shall be maintained in a well-drained condition in order to: -
Answer -Minimize Free Water Content

Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch
for FDOT? - Answer -24

Free moisture of the aggregate means: - Answer -Moister on the surface of an
aggregate that is above and beyond the absorbed moister in the aggregate.

If the moister test is done other than by the cook-out method, how often shall the other
methods be verified? - Answer -Each week

When the water meters / scales are calibrated, prior to production, at what frequency
should they be checked there after? - Answer -3 moths

To what accuracy should the scales for weighing cement , pozzolan, slag and
aggregates at the plant be maintained - Answer -0.5% of maximum load normally
handled

For concrete containing a water-reducing retarding admixture, in an agitator truck, the
maximum time for depositing the concrete shall not exceed: - Answer -90 minutes

If a load of concrete has been rejected due to excessive slump, the concrete may
remain in the transporting vehicle to reduce the slump. - Answer -Is not allowed.

Who places the orders for concrete with the producer? - Answer -The contractor

The minimum normal sampling frequency for the chloride content of structural concrete
is: - Answer -1 per design mix in use from the first day of production and every 30
calendar days or less thereafter.

In what moister condition are the aggregates on the approved concrete mix designs? -
Answer -SSD condition

The specific gravity of an aggregate is the ratio of its unit weight to the weight of an
equal absolute volume of: - Answer -Water

What is the weight of a bag of Portland cement in the USA? - Answer -94 lbs

What is the maximum concrete temperature allowed when using a hot weather design
mix? - Answer -100 degrees F

For drill shaft concrete, the quantity of cement replaced with fly ash shall be: - Answer -
33 thru 37%
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEEKA YALA UNIVERSITY
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2011
Miembro desde
3 año
Número de seguidores
1447
Documentos
48584
Última venta
11 horas hace

3.8

345 reseñas

5
172
4
61
3
44
2
16
1
52

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes