The governing order of project documents from high (1) to low (7) starts with the highest being - Answer -Special Provisions The governing order of project documents from high to low (2) - Answer -Technical Special Provisions The governing order of project documents from high to low (3) - Answer -Plans The governing order of project documents from high to low (4) - Answer -Road design, structures, and traffic operations standards The governing order of project documents from high to low (5) - Answer -Developmental Specifications

Mostrar más Leer menos
Institución
FDOT
Grado
FDOT









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
FDOT
Grado
FDOT

Información del documento

Subido en
7 de agosto de 2025
Número de páginas
7
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

FDOT ASPHALT PAVING LEVEL 2 QUESTIONS

What makes up a quality asphalt mixture? - Answer -A quality asphalt mixture is
determined by the constructability, if it conforms to Specifications, and if it satisfies
functional requirements.

CQC - Answer -contractor quality control

Superpave - Answer -Asphalt mix design system since 1998

QCP - Answer -Quality control plan

QCM - Answer -Quality control Manual

QC - Answer -Quality Control (Contracting Testing and Inspection)

VT - Answer -Verification Testing (FDOT or CEI Verification)

CEI - Answer -Construction Engineering and Inspection

RT - Answer -Resolution Testing (FDOT)

IV - Answer -Independent Verification Testing

IA - Answer -Independent Assurance Testing

The decision-making authority on a job needs to be given to who? - Answer -Needs to
be given to the level closet to the work as specified in the specifications. It ensure a
quick handle on situations and issues.

The governing order of project documents from high (1) to low (7) starts with the highest
being - Answer -Special Provisions

The governing order of project documents from high to low (2) - Answer -Technical
Special Provisions

The governing order of project documents from high to low (3) - Answer -Plans

The governing order of project documents from high to low (4) - Answer -Road design,
structures, and traffic operations standards

The governing order of project documents from high to low (5) - Answer -
Developmental Specifications

, The governing order of project documents from high to low (6) - Answer -Supplemental
Specifications

The governing order of project documents from high to low (7) - Answer -Standard
Specifications

What are the key components in a pre-construction conferences? - Answer -Agency
Input (FDOT)
Contractor Input (Including the Prime)
Project Personnel (Upper - Middle management)
Testing
Safety
Utilities
Cities or Municipalities (HOA, school boards)
Suppliers

What causes the compactive effort increase? - Answer -Crushed aggregate content
Nominal maximum size
Hardness of the aggrergate
Angularity of aggregate
Less natural sand
High dust content mixes
Gradation of the mix greatly affects compaction
Superpave mixes

What kind of Performance Graded binders are there? - Answer -PG 67-22 (old AC-30)
PG 52-82
PG 58-22
PG 76-22 (PMA) Polymer modified asphalt
PG 76-22 (ARB) Asphalt rubber binder
PG 82-22 (PMA) polymer modified asphalt

What are the key components in a pre-paving conferences? - Answer -Key Personnel
(Paving superintendent)
Contractor Input
Agency Input
QC Plan Review
Discuss more specific key topics or issues
Meeting Minutes
Action items (what to do in situations, who to call)

What are PG binders tested for high temperature wise? - Answer -A 7 day max
pavement temp of 67C

What are PG binders tested for low temperature wise? - Answer --22C
$13.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEEKA YALA UNIVERSITY
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2011
Miembro desde
3 año
Número de seguidores
1447
Documentos
48584
Última venta
7 horas hace

3.8

345 reseñas

5
172
4
61
3
44
2
16
1
52

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes