100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

MGMT 339 FINAL QUESTIONS AND ANSWERS 2025

Puntuación
-
Vendido
-
Páginas
17
Grado
A+
Subido en
06-08-2025
Escrito en
2025/2026

MGMT 339 FINAL QUESTIONS AND ANSWERS 2025

Institución
MGMT 339
Grado
MGMT 339

Vista previa del contenido

MGMT 339 FINAL

A conveyance --- signals parts movement - ANSWERS-kanban


With regard to suppliers, lean systems typically requires -
ANSWERS-long-term relationships and commitments


In which phase of the project life cycle is the work conducted? -
ANSWERS-executing


If an activity is determined to be on the critical path, that means that
unlike activities that are not on the critical path, it will affect project -
ANSWERS-duration.


In a project network, the critical path is the sequence of activities
which has the - ANSWERS-longest duration.


The project management strategy of injecting additional resources in
order to reduce the length of the project is called - ANSWERS-
crashing.


A hierarchical listing of what must be done in a project is called a -
ANSWERS-work breakdown structure (WBS).


A sequence of activities that leads from the starting node to the
finishing node is called a - ANSWERS-path.

,One upside to terminating a project that is not going as well as
planned is that - ANSWERS-resources can perhaps be put to better
use elsewhere.


The advantage a precedence diagram has over a Gantt chart is -
ANSWERS-its ability to reveal relationships among activities.


Which of the following would probably not involve the use of PERT?
- ANSWERS-writing a poem


At which point does crashing of a project cease? - ANSWERS-when
the cost to crash equals or exceeds the benefit of crashing


Which of the following stages is that one in which the project's
expected costs, benefits, and risks are assessed? - ANSWERS-
Initiating


In the execution phase of a project's life cycle, activities are guided by
decisions that were made in the __________ phase. - ANSWERS-
planning


. In project network analysis, "slack" refers to the difference between -
ANSWERS-latest and earliest times.

, A method used for establishing a logical framework for identifying
the required activities for the project is called - ANSWERS-work
breakdown structure.


A popular visual tool for planning and scheduling simple projects, and
for monitoring progress, is the - ANSWERS-Gantt chart.


.Which decision in project management has typical factors that
include establishing appropriate metrics for evaluating the project and
managing equipment? - ANSWERS-managing and controlling project
resources


Which phase of the project life cycle happens in conjunction with
project execution? - ANSWERS-monitoring and controlling


A project is represented by the following diagram:
The critical path for the network shown is: - ANSWERS-1-3-6-7.


Which of the following is determined as a direct result of computing
the earliest starting and finishing times for the activities of a project
network? - ANSWERS-expected project duration


Gantt charts are most closely associated with - ANSWERS-PERT


In the execution phase of a project's life cycle, activities are guided by
decisions that were made in the __________ phase - ANSWERS-
planning

Escuela, estudio y materia

Institución
MGMT 339
Grado
MGMT 339

Información del documento

Subido en
6 de agosto de 2025
Número de páginas
17
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$18.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Teacher101 Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
397
Miembro desde
1 año
Número de seguidores
71
Documentos
9286
Última venta
9 horas hace

Quality is my middle name.....100% ...my policy is to create and nurture people of quality by continuous education and training.....i guaranteed good grades 100% Feel free to get in touch through inbox...anything regarding help or issue with the exams posted... Finally after purchase please leave a good rating if satisfied with my work.... All the best as we continue working to improve ourselves through education

4.6

266 reseñas

5
218
4
14
3
24
2
3
1
7

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes