100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

PJM Transmission Exam Study 2025 Questions and Answers

Puntuación
-
Vendido
-
Páginas
45
Grado
A+
Subido en
04-08-2025
Escrito en
2025/2026

PJM Transmission Exam Study 2025 Questions and Answers

Institución
PJM
Grado
PJM











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
PJM
Grado
PJM

Información del documento

Subido en
4 de agosto de 2025
Número de páginas
45
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PJM Transmission Exam Study 2025
Questions and Answers


During System Restoration, what is the optimal Frequency Range? - --CORRECT

ANSWER--59.75 - 61 Hz

The 500 kV system has normal bus voltages between? - --CORRECT ANSWER--

500 to 550 kV

When Connecting 2 islands, the operator must match? - --CORRECT ANSWER--

Voltage, Phase Angle and Frequency

What are the Minimum Source Requirements for a 500kV line? (Gen/mile and

load/mile) - --CORRECT ANSWER--30 MW Gen/mile of energized 500 kV and

20 MW Load/mile of energized 500 kV

When will PJM issue a Minimum Generation Alert? (how many MW under normal

operating limits) - --CORRECT ANSWER--When expected generation levels fall

within 2500 MW of normal operating limits

When a thunderstorm is nearing the BES should auto-reclosing be turned on? - --

CORRECT ANSWER--Yes




....COPYRIGHT ©️ 2025 ALL RIGHTS RESERVED...TRUSTED & VERIFIED 1

,What does SCADA stand for? - --CORRECT ANSWER--Supervisory Control &

Data Acquisition

What does IROL stand for? - --CORRECT ANSWER--Interconnection Reliability

Operating Limit

What does eDART stand for? - --CORRECT ANSWER--Dispatcher Application

and Reporting Tool

What is eDART used for? (Electronic Disp Reporting Tool) - --CORRECT

ANSWER--It is used for: Generation Outage Scheduling, Instantaneous Reserve

Checks, Generator Reactive Capabilities and to enter and submit switching

What direction do VARS flow? - --CORRECT ANSWER--From HIGH Voltage

to LOW Voltage

What direction do MW flow? - --CORRECT ANSWER--From HIGH Phase

Angle to LOW Phase Angle

Which of the following factors are NOT used in forecasting load?




1) Weather Forecast

2) Historical Load Forecast

3) Historical Weather Data

4) Locational Marginal Pricing (LMP) Data - --CORRECT ANSWER--4


....COPYRIGHT ©️ 2025 ALL RIGHTS RESERVED...TRUSTED & VERIFIED 2

,What one-way communication system is used to disseminate info to local call

centers? - --CORRECT ANSWER--All-Call

The 3 categories of messages issued by PJM All-Call all EXCEPT:




1) Operational

2) Informational

3) Conflicting Interchange Values

4) Emergency Procedures - --CORRECT ANSWER--3

When should, transmission outages should be submitted to PJM to avoid

cancellation and to be considered "on time?' - --CORRECT ANSWER--First day

of Month Prior to the Outage

What report will be requested by PJM when a Max Generation Alert is issued? - --

CORRECT ANSWER--Supplementary Status Report (SSR)

The loss of a large generation unit on the PJM system can be detected by

monitoring: - --CORRECT ANSWER--Frequency and PJM Area Control Error

(ACE)

The PJM system is operated such that the contingency flow is less than the: - --

CORRECT ANSWER--Emergency Rating




....COPYRIGHT ©️ 2025 ALL RIGHTS RESERVED...TRUSTED & VERIFIED 3

, When ordered a 5% voltage reduction should be taken on: - --CORRECT

ANSWER--The Distribution System

TOs are required to report "Hot Line Work" on what voltage levels? - --

CORRECT ANSWER--345 kV and Above

Load dump rating of an EHV line is determined by? - --CORRECT ANSWER--

115% of the facility's 4 hour Emergency Rating

During System Restoration, will closing additional tie lines increase the strength &

stability of an interconnected area? - --CORRECT ANSWER--Yes

Which of the following factors influence load forecast (3)?




1) Weather

2) Temperature

3) Reactive Reserves

4) Day of the week - --CORRECT ANSWER--1, 2, 4

During system restoration, what is the voltage range the system should be kept

between? - --CORRECT ANSWER--90% and 105% maintain voltage profile

between for system restoration

PJM will coordinate and direct all restoration lines of what voltage levels? - --

CORRECT ANSWER--500kV and above


....COPYRIGHT ©️ 2025 ALL RIGHTS RESERVED...TRUSTED & VERIFIED 4
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
KatelynWhitman West Virginia University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1106
Miembro desde
2 año
Número de seguidores
482
Documentos
34109
Última venta
2 días hace
Golden Quill Emporium Store

Get Yourself Well-Researched Study Materials to Ace Your Online& Actual Exam Tests with Confidence. STUDY LIKE A PRO WITH A WELL FORMATTED Q&A MATERIALS.

3.6

241 reseñas

5
96
4
39
3
54
2
20
1
32

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes