CSLB B LICENSE GENERAL CONTRACTOR EXAM 2025/2026
CSLB B LICENSE GENERAL CONTRACTOR EXAM 2025/2026 If unused mortar stiffens due to hydration of cement, what must you do? - answer-Discard the mortar What minimum time must you wait before caulking or grouting new tiles? - answer-24-48 Hours How long should you wait before installing tile on a shower pan? - answer-24 Hours Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: - answer-Type-B Soils If 65 street lights are fed by a 2275 volt series circuit, what is the voltage across each light? - answer-35V In a series circuit, the total voltage is divided equally. For safety reasons, the maximum simple slope of an excavation, up to 20 ft deep, in Type-B soil is: - answer-1:1 (45°) A Pittsburgh joint is used in: - answer-HVAC ductwork The drain for a pressure relief valve on a water heater should be extended to: - answer-The outside of the building What is the minimum slope toward the drain of a shower pan? - answer-1/4" per foot (2%)
Escuela, estudio y materia
- Institución
- Cslb b license
- Grado
- Cslb b license
Información del documento
- Subido en
- 2 de agosto de 2025
- Número de páginas
- 43
- Escrito en
- 2025/2026
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
cslb b license general contractor exam
Documento también disponible en un lote