A ______ for "REDZONE" must be established from the centerline of
Roadway Machines to either side of the machine and ____ feet from
either end. Ans✓✓✓ 25/50
A job briefing for on track safety shall be deemed complete only after:
Ans✓✓✓ The affected workers has acknowledge of the on-track safety
procedures and instructions presented or they have been afforded the
opportunity to request an explanation of any issues that are not
understood.
A Lone Worker who chooses to use individual train detection to
establish on-track safety shall first complete a written Statement of ON-
track Safety. Ans✓✓✓ True
A method of establishing working limits of controlled track in which
movement authority of trains and other equipment is withheld by the
train dispatcher or control operator, is known as: Ans✓✓✓ Exclusive
track Occupancy
A procedure by which a lone worker acquired on-track safety by seeing
approaching trains and leaving the track before they arrive is know as:
Ans✓✓✓ Individual Train Detection (ITD)
A roadway worker has an absolute right to challenge, in good faith,
whether the on-track safety procedures applied at the job site comply
, with the RWP & RMM Program and safety and operating rules.
Ans✓✓✓ True
A state of freedom from the danger of being struck by a train or other
equipment, provided by operating and safety rules that govern track
occupancy by personel, train and on-track equipment is known as:
Ans✓✓✓ On-track Safety Protection
A Watchman/lookout's sole duty is to look out for approaching trains/
on-track equipment and provide warning to allow Roadway Workers to
move to and accupy the designated place of safety at least ____ seconds
before the arrival of trains/ on-track equipment. Ans✓✓✓ 15
All employees are required to wear high-visibility workwear when they
are on duty or on the company property. Such high-visibility workwear
must be worn as the outermost layer of clothing. Ans✓✓✓ True
All employees shall give absolute priority to emergency
communications. the frequency or channel will be kept clear of non-
emergency traffic for the duration of the emergency communications.
Ans✓✓✓ True
All on-track equipment will be operated in accordance with instructions
and procedures form the manufacture for each machine used. These safe
operating instructions and procedures must be on the equipment.
Ans✓✓✓ True