Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 119 páginas
Examen

AF Contracting Officer Study Guide 2023–2025 PDF – Complete USAF Acquisition Prep

Document preview thumbnail
Vista previa 4 fuera de 119 páginas

AF Contracting Officer Study Guide. Includes FAR, DFARS, acquisition strategy, contract types, and USAF procurement policies.

Vista previa del contenido

AF Contracting Officer Study Guide
2023 – 2024


Source Selection

FAR 1.602-2; 3.104-4; 15.207

(2016-05-31)

Q: What are the CO's responsibilities in source selection? - 1. Procedures to safeguard source selection
information.

2. Approve access to/release source selection information.

3. Maintain SS evaluation records.



*Source Selection*

2016 DoD Source Selection Manual, 1.4.1.2

(2016-05-31)



Q: What are the SSA responsibilities? - 1. Proper and efficient conduct of SS process.



2. Appoint respective chairpersons.



3. Establish SS team and ensure their knowledge of policy/procedure.



4. Ensure pace is event and not schedule driven (realistic SS schedule).



*Financing*

FAR 32.106

(2016-05-31)

,Q: Name the different types of government financing in order of their preference - 1. Private financing
(most preferred).



2. Performance based payments.



3. Customary progress payments.



4. Guaranteed loans.



5. Unusual progress payments.



6. Advance payments (least preferred).



Acquisition Strategy Panel (ASP)

AFFARS 5307.104-92; AFICA MP 5307.104-92

(2016-05-31)



Q: Who prepares the ASP minutes, when are they prepared and who approves them?



*AIR FORCE ONLY* - Program manager, CO or Commodity Council Director prepares following the
conclusion of the ASP briefing, and approved by the ASP chairperson.



*Cost Analysis*

FAR 15.404-1 (c)

(2016-05-31)



Q: What is cost analysis? - Review and evaluation of separate elements and profit of contractor's
proposal. The application of judgment to determine how well proposed costs represent what the cost of
the contract should be assuming reasonable economy and efficiency. Techniques include verification of

,cost or pricing data and evaluation of cost elements; projection of offeror's cost trends based on
current/historical cost/pricing data; audit and negotiated indirect cost, labor and COM rates.



IDIQ

FAR 16.504 (a)

(2016-05-31)



Q: How does the PCO compute the minimum and maximum quantity on an IDIQ contract? - 1. Minimum-
Should be more than a nominal quantity but should not exceed amount the Government is fairly certain
to order.



2. Maximum - A reasonable max should be established by conducting market research trends on recent
contracts for similar supply/svcs, survey of potential users, other rational basis.



Estimating Systems

FAR 15.407-5

(2016-05-31)



Q: Define estimating system and cost reimbursement. - Estimating system is contractor's
policies/procedures/practices for generating estimates. Includes organizational structure, internal
controls, and managerial reviews, work flow, est methods, techniques, accumulation of historical costs
and other analysis. Cost reimbursement - Contractor's ability to accurately and reliable estimate costs
could lead to cost overruns and increased risk for the Government.



Defective Pricing

FAR 15.407-1

(2016-05-31)



Q: What are six conditions which must exist to have defective pricing? - 1. Information fits the definition
of cost and pricing data.



2. Accurate data was available to the contractor before the agreement on price.

, 3. Data was not accurate, current, complete as of date of agreement.



4. Data was not submitted to CO.



5. Government must have relied on the data.



6. An increase in cost as a result of Government reliance on the data.



Contract Elements

Common Law

(2016-05-31)



Q: What are the essential elements of a contract? - 1. Offer.



2. Acceptance.



3. Consideration.



4. Lawful purpose.



5. Competency of parties.



6. Certainty of terms.



Economy Act

31 U.S.C. 1535; FAR 17.502-2

(2016-05-31)

Información del documento

Subido en
29 de julio de 2025
Número de páginas
119
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$15.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
dmaspanah001
5.0
(1)
Vendido
2
Seguidores
0
Artículos
125
Última venta
4 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes