100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

PRO4801 Assignment 3 (ANSWERS) Semester 2 2025 - DUE September 2025

Puntuación
5.0
(2)
Vendido
6
Páginas
19
Grado
A+
Subido en
24-07-2025
Escrito en
2024/2025

PRO4801 Assignment 3 Semester 2 2025 - DUE September 2025 DUE AUGUST 2025 Question 3.1 The ABC project faced many challenges, including delays and budgetary constraints. Among the key issues raised has been the specification of the product, which must ensure the customer gets value for money. It is reported that poor planning was the order of the day due to a lack of experience of the hired project manager and a lack of guidelines regarding approaches to take. Office to provide guidance and support. As an expert who completed PRO4801 and with experience gained over the years working on various types of projects, you have been hired as a consultant to provide guidelines on how planning should be undertakenYou’re required to provide confidence to the appointing authority by addressing the questions (3.1, 3.2, 3.3) posed in the different sections. Distinguish between the different steps in the project planning process and explain the purpose of typical questions to be answered in each step. Define the Desired End Result Establish what the project must deliver and the performance targets it must meet. Typical questions What are the high‑level objectives? What deliverables (products, services, reports) are required? What scope boundaries must be respected?

Mostrar más Leer menos
Institución
Grado










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
24 de julio de 2025
Número de páginas
19
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PRO4801
ASSIGNMENT 3
DUE DATE: AUGUST 2025

,PRO4801 Assignment 3 2025

DUE AUGUST 2025



Question 3.1

The ABC project faced many challenges, including delays and budgetary constraints.
Among the key issues raised has been the specification of the product, which must
ensure the customer gets value for money. It is reported that poor planning was the
order of the day due to a lack of experience of the hired project manager and a lack of
guidelines regarding approaches to take.

Office to provide guidance and support. As an expert who completed PRO4801 and
with experience gained over the years working on various types of projects, you have
been hired as a consultant to provide guidelines on how planning should be undertaken.
You’re required to provide confidence to the appointing authority by addressing the
questions (3.1, 3.2, 3.3) posed in the different sections.



Distinguish between the different steps in the project planning process and
explain the purpose of typical questions to be answered in each step.



Define the Desired End Result
Establish what the project must deliver and the performance targets it must meet.
Typical questions
What are the high‑level objectives?
What deliverables (products, services, reports) are required?
What scope boundaries must be respected?
What are the time, cost and quality (performance) targets?

All of these define the “what” of the project so that everyone understands exactly why
the work is being done (Chapter 6.1, p. 166).

, Determine How the Result Will Be Achieved
Break the overall objectives into discrete work, so you know how to get from “we
need X” to “we have X.”
Typical questions
What major activities or work packages must be completed?
Which tasks are required to produce each deliverable?
What administrative or control activities are needed (e.g., reporting, reviews)?
This step creates the basic work structure (WBS) that underpins scheduling and
estimating (Chapter 6.1, p. 166).



Assign “Who” Will Do the Work
Define the project organization and clarify responsibilities for every task.
Typical questions
Which team members or departments own each work package?
Will any subcontractors or external specialists be needed?
Who has ultimate accountability for deliverables and milestones?
Without clear roles and responsibilities, tasks can be overlooked or duplicated
(Chapter 6.1, p. 166).



4. Establish “When” and in What Sequence
Transform the list of tasks into a time‑based schedule, showing dependencies and
deadlines.
Typical questions
In what logical order must tasks occur?
What are the prerequisite and successor relationships?
What are the key milestone and review dates?
$3.08
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Reseñas de compradores verificados

Se muestran los 2 comentarios
2 meses hace

3 meses hace

5.0

2 reseñas

5
2
4
0
3
0
2
0
1
0
Reseñas confiables sobre Stuvia

Todas las reseñas las realizan usuarios reales de Stuvia después de compras verificadas.

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Unisian University of South Africa (Unisa)
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
4436
Miembro desde
2 año
Número de seguidores
1437
Documentos
593
Última venta
1 mes hace
Unisian

4.3

490 reseñas

5
317
4
60
3
73
2
15
1
25

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes