True - CORRECT ANSWER Building codes and standards are largely silent on temporary structures and the technical literature is scant on the subject. All of the above - CORRECT ANSWER Temporary support and access structures have a critical effect on the ______ of construction projects. True - CORRECT ANSWER A contractor for simple temporary structures has to submit detailed plans, prepared or checked and signed by a licensed professional engineer. when they are necessary parts of the construction of the final project - CORRECT ANSWER When is the owner concerned with temporary structures?

Vista previa del contenido

CM 413 Jobsite Final Exam UPDATED
QUESTIONS AND CORRECT ANSWERS
True - CORRECT ANSWER Building codes and standards are largely silent on
temporary structures and the technical literature is scant on the subject.



All of the above - CORRECT ANSWER Temporary support and access structures have
a critical effect on the ______ of construction projects.



True - CORRECT ANSWER A contractor for simple temporary structures has to
submit detailed plans, prepared or checked and signed by a licensed professional engineer.


when they are necessary parts of the construction of the final project - CORRECT
ANSWER When is the owner concerned with temporary structures?



are different from - CORRECT ANSWER Aspects of temporary structures, such as
design, allowable stresses and loads, materials, and inspection, _______ the permanent
structure.



amount of safety staff on site - CORRECT ANSWER Which of the following is not a
factor in the design of temporary structures?



Years of experience of the site superintendent - CORRECT ANSWER Which of the
following is NOT a factor inherently involved in the design loads, allowable stresses, and
safety factors used for the design of various structures:



True - CORRECT ANSWER Temporary structures are often constructed of reusable
prefabricated elements.



General Liability insurance - CORRECT ANSWER What type of insurance covers the
owner and the contractor for the risks assumed in temporary construction?

, All of the above - CORRECT ANSWER Who is responsible for the inspection of
temporary structures



True - CORRECT ANSWER A "grandfather" clause is when owners and engineers
attempt to pass on the unexpected costs to the contractor.



All of the above - CORRECT ANSWER When is insurance applied or required



Depends on the Contract - CORRECT ANSWER Who is responsible for unexpected
underground conditions?



Develop a budget and create separate accounts for each project. - CORRECT
ANSWER What is a good banking strategy for tracking money for each project?



The Temporary Structure Contractor - CORRECT ANSWER Who is responsible for
drawing up the specifications for the temporary structure?



True - CORRECT ANSWER Estimates for the cost of temporary structures entail a
three step process?



All of the above - CORRECT ANSWER A contractor's cost-keeping system should
provide the contractor with information for which of the following?



True - CORRECT ANSWER A cost of labor and materials plus markup is the type of
change order that occurs when there is no agreement between the parties as to how to best
resolve the value of a completed change.



All of the above - CORRECT ANSWER What goes into the cost estimate of temporary
structures?



True - CORRECT ANSWER Liability arising from plans and design is usually
excluded from most owners' and contractors' liability insurance.

Información del documento

Subido en
20 de julio de 2025
Número de páginas
5
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$11.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Vendido
58
Seguidores
2
Artículos
8115
Última venta
4 semanas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes