Which of the following are Roof Variables - correct-answer-SF, SQ, HIP, VAL, R, P
An alternate method of estimating for a loss can be done from the Sketch Tab. -
correct-answer-True
Draw lines to match the following Staircase Variable to its correct definition -
correct-answer-a. Tread Count TCAS
b. Wall and Ceiling Area Above Staircase WCAS
c. Wall Area Below Staircase WBS
d. Floor Area Above Staircase FAS
e. Perimeter of Ceiling Below Staircase PCBS
You can add line items while viewing your sketch in 3D mode - correct-answer-
True
, Page |2
When using subvariables, what room number does Xactimate assign to the main
area of the room? - correct-answer-0
It is possible to add a line item for tile floor covering at the same time as adding a
reference area. - correct-answer-True
Which of the following columns in the Estimate Items/Quick Entry window allow
you to track who entered the line item? - correct-answer-User Column
If the activity of an item is changed, the unit price for the item does not change. -
correct-answer-False
__________ are those additional activities, such as labor or material assumption,
which may be required to complete a task. - correct-answer-Supporting Events
To keep the ridge from shifting when modifying a single rafter length on a gable
roof, use the following tool: - correct-answer-Roof Locks