Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 1 fuera de 2 páginas
Examen

INFOSYS REVIEW 2 SDLC Questions and answers graded A+ 2025/2026

Document preview thumbnail
Vista previa 1 fuera de 2 páginas

INFOSYS REVIEW 2 SDLC Questions and answers graded A+ 2025/2026

Vista previa del contenido

INFOSYS REVIEW 2 SDLC
Can you listed all the SDLC phases? - ANS-Planning
Analysis
Design
Implementation (Development)
Testing
Deployment (Installation)
Maintenance

Can you explain the objectives and the activities of the planning phase? - ANS-Objective:
Define the scope, objectives, and feasibility of the project.
Activities: Conduct feasibility studies, define project goals, identify stakeholders, establish
project timelines and budget.

Can you explain the objectives and the activities of the analysis phase? - ANS-Objective:
Gather and analyze requirements to understand what the system needs to accomplish.
Activities: Interview stakeholders, document requirements, create use cases, develop
prototypes.

Can you explain the objectives and the activities of the design phase? - ANS-Objective: Create
a detailed plan for how the system will be built, including architecture, data models, and user
interfaces.
Activities: Create system architecture, design database structure, develop user interface
mockups, outline system functionalities.

Can you explain the objectives and the activities of the implementation phase? - ANS-Objective:
Translate the design into actual code and develop the system.
Activities: Write code, integrate software modules, conduct unit testing, develop documentation.

Can you explain the objectives and the activities of the testing phase? - ANS-Objective: Verify
that the system meets the specified requirements and functions correctly.
Activities: Conduct various types of testing such as unit testing, integration testing, system
testing, and user acceptance testing (UAT). Identify and fix defects.

Can you explain the objectives and the activities of the deployment phase? - ANS-Objective:
Deploy the system into the production environment and make it available for use.
Activities: Install the software, configure the system, migrate data, provide training to users,
perform system acceptance.

Can you explain the objectives and the activities of the maintenance phase? - ANS-Objective:
Ensure that the system continues to meet user needs and remains operational over time.

Información del documento

Subido en
19 de julio de 2025
Número de páginas
2
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
1
Seguidores
0
Artículos
638
Última venta
1 año hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes