L Rating - (answers)A firestops ability to provide a smoke stop. (air leakage rate)
To avoid damaging cable jacket, how often must you securely fasten electrical nonmetallic
tubing (ENT) - (answers)3 Feet so it does not damage the cable
What is the minimum dedicated power requirement of a telecommunications enclosure -
(answers)120 V ac/20
The clearance behind the PBB when mounted, should be no less than- - (answers)2inch clearance
behind the PBB when mounted
When installing a plywood backboard, you should use galvanized screws that are a minimum of
______ longer than the depth of the wall covering, including the plywood - (answers)0.5in
The use of under carpet telecommunications cable should be limited to: - (answers)The
interconnection point between horizontal cabling and UTC is a transition point (TP)
Two 90-degree bends are allowed in any one conduit segment. A third bend may be acceptable
under certain situations - (answers)Runs under 33 feet
When installing racks and cabinets on an access floor, what should they be secured to? -
(answers)The frame
When placing cabinets on an access floor, how should the cabinets be aligned? - (answers)One
edge flush with the floor tile cut line
, What is a telecommunications enclosure TE used for? - (answers)May be used to provide a
suitable option for moves, adds, and changes without compromising infection control measures
and other restrictions
What size threaded rod would you typically use in a heavy duty ladder rack installation? -
(answers)5/8in
A supplemental bonding network within an ER or data center consisting of a set of conductors
formed into a grid is often associated with what? - (answers)Access flooring
Which type of anchor requires a hole to be drilled into the floor where the attachment is to be
made? - (answers)Expansion anchors
Min seperation from electric motors and transformers? - (answers)48"
During which phase of the project would you determine cable labeling requirements? -
(answers)Pre-construction Phase
What type of documentation uses the original floor plans and reflects the actual installed outlet
locations, cables, length, and firestopping materials? - (answers)Record drawings
Which project document is used to request clarification, supplemental information, or approval
of material substitutions? - (answers)RFI
Comparing design documents to existing conditions, verifying parking access, and determining
the work hours are all examples of what you would learn during - (answers)A job start
T1 - (answers)Layout of complete building per floor; serving zone boundaries, backbone
distribution systems, and horizontal pathways
T0 - (answers)Campus or site plans; exterior pathways and interbuilding systems
QUESTIONS WITH CORRECT DETAILED AND VERIFIED ANSWERS-MOSTLY
TESTED QUESTIONS| RATED 100% CORRECT!! GUARANTEED PASS!! ALREADY
GRADED A+
L Rating - (answers)A firestops ability to provide a smoke stop. (air leakage rate)
To avoid damaging cable jacket, how often must you securely fasten electrical nonmetallic
tubing (ENT) - (answers)3 Feet so it does not damage the cable
What is the minimum dedicated power requirement of a telecommunications enclosure -
(answers)120 V ac/20
The clearance behind the PBB when mounted, should be no less than- - (answers)2inch clearance
behind the PBB when mounted
When installing a plywood backboard, you should use galvanized screws that are a minimum of
______ longer than the depth of the wall covering, including the plywood - (answers)0.5in
The use of under carpet telecommunications cable should be limited to: - (answers)The
interconnection point between horizontal cabling and UTC is a transition point (TP)
Two 90-degree bends are allowed in any one conduit segment. A third bend may be acceptable
under certain situations - (answers)Runs under 33 feet
When installing racks and cabinets on an access floor, what should they be secured to? -
(answers)The frame
When placing cabinets on an access floor, how should the cabinets be aligned? - (answers)One
edge flush with the floor tile cut line
, What is a telecommunications enclosure TE used for? - (answers)May be used to provide a
suitable option for moves, adds, and changes without compromising infection control measures
and other restrictions
What size threaded rod would you typically use in a heavy duty ladder rack installation? -
(answers)5/8in
A supplemental bonding network within an ER or data center consisting of a set of conductors
formed into a grid is often associated with what? - (answers)Access flooring
Which type of anchor requires a hole to be drilled into the floor where the attachment is to be
made? - (answers)Expansion anchors
Min seperation from electric motors and transformers? - (answers)48"
During which phase of the project would you determine cable labeling requirements? -
(answers)Pre-construction Phase
What type of documentation uses the original floor plans and reflects the actual installed outlet
locations, cables, length, and firestopping materials? - (answers)Record drawings
Which project document is used to request clarification, supplemental information, or approval
of material substitutions? - (answers)RFI
Comparing design documents to existing conditions, verifying parking access, and determining
the work hours are all examples of what you would learn during - (answers)A job start
T1 - (answers)Layout of complete building per floor; serving zone boundaries, backbone
distribution systems, and horizontal pathways
T0 - (answers)Campus or site plans; exterior pathways and interbuilding systems