100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Resumen

Summary finance Q2Y2, Chapter 8/3/10 including powerpoints

Puntuación
-
Vendido
1
Páginas
20
Subido en
18-10-2020
Escrito en
2019/2020

Summary financial and management decisions year 2 Q2 Avans hogeschool. Chapters 3/8/10 including powerpoints. Introduction to Management Accounting

Institución
Grado










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Libro relacionado

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

¿Un libro?
No
¿Qué capítulos están resumidos?
3,8,10
Subido en
18 de octubre de 2020
Número de páginas
20
Escrito en
2019/2020
Tipo
Resumen

Temas

Vista previa del contenido

Finance summary year 2 Q2
Chapter 8 flexible budgets and variance analysis
1. identify variances and label them as favorable or unfavorable
We label profit, revenue, and cost variances as favorable or unfavorable depending on the
direction of the effect on profitability.
- Favorable profit variances arise when actual profits exceed budgeted profits.
- Unfavorable profit variances arise when actual profits fall below budgeted profits.

Because increases in revenues increase profits, revenue variances work in exactly the same
way: When actual revenues exceed budgeted revenues we have favorable revenue
variances, and actual revenues below budgeted revenues result in unfavorable revenue
variances.

However, cost variances work in the opposite way because increases in costs decrease
profitability: When actual costs exceed budgeted costs we have unfavorable cost variances,
and actual costs less than budgeted costs result in favorable cost variances. The following
chart summarizes these relationships using the abbreviations that we will use for favorable
(F) and unfavorable (U) variances.




2. Distinguish between flexible budgets and static budgets.
A budget prepared for only one expected level of activity is a static budget. revenues, costs,
and profits expected
A budget that adjusts to different levels of activity is a flexible budget (sometimes called a
variable budget). revenues, costs, and profits expected at different volumes.

Differences between actual results and the static budget for level of output achieved are
static-budget variances.

A flexible budget (variable budget) adjusts for different levels of activities.
Differences between actual results and the flexible budget are flexible-budget variances.

3. Use flexible-budget formulas to construct a flexible budget based on the volume of
sales.
To develop a flexible budget, managers use flexible-budget formulas that describe revenue
and cost behavior with respect to appropriate cost drivers. The cost functions are examples
of flexible-budget formulas. The flexible budget incorporates effects of changes in activity on
each revenue and cost. Note that the static budget is just the flexible budget for a single
assumed level of activity.

3. Prepare an activity-based flexible budget. miss niet
- approach when units of output is a plausible and reliable cost driver for all

, of a company’s cost. → flexible budget
- activity-based flexible budget; a budget based on budgeted costs for each activity
using the related cost driver
- four activities; processing, setup, marketing, administration

4. Explain the performance evaluation relationship between static budgets, flexible
budgets, and actual results.
Actual results may differ from the master budget because sales and other cost-driver
activities were not the same as originally forecasted or revenue or variable costs per unit of
activity and fixed costs per period were not as expected

Actual results might differ from the static budget because (1) actual output levels were not
the same as in the static budget, or (2) actual revenues and costs differed from those in the
flexible budget for the actual level of output achieved.

Isolating the Causes of Variances
Managers use comparisons among actual results, master budgets, and flexible budgets to
evaluate organizational performance.

5. Compute activity-level variances and flexible-budget variances.
static budget variance; the difference between actual results and the static budget for the
original planned level of output.
- the difference between actual results and the flexible budget
- the difference between the flexible budget and the static budget → the
activity level variance

flexible budget variance; the difference between actual results and the flexible budget for the
actual level of output achieved.
Just as we can divide income into its component revenues minus costs, we can divide the
flexible-budget income variance into revenue and cost variances.
Total flexible-budget variance = Total actual results – Total flexible-budget planned results
(at sales level)
de kosten van de sales die echt hebben plaatsgevonden - real amount of pounds sold x
expected cost

activity level variances; the differences between the static budget amounts and the amounts
in the flexible budget.

sales activity variances; the activity-level variances when sales is used as the cost driver.
sales activity income variance = ( actual unit - static budget units) x contribution margin per
unit

there can never be a sales activity variance for fixed costs, as long as the budgeted activity
levels remain within the relevant range. because for fixed costs,the total budgeted amounts
are the same in the flexible budget and the static budget.

,
$6.61
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
kimmyhansen0212 Avans Hogeschool
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
36
Miembro desde
6 año
Número de seguidores
28
Documentos
15
Última venta
2 año hace

2.5

4 reseñas

5
1
4
0
3
1
2
0
1
2

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes