100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

PJM GENERATION DISPATCH EXAM 200 QUESTIONS & CORRECT ANSWERS LATEST 2025

Puntuación
-
Vendido
-
Páginas
70
Grado
A+
Subido en
09-07-2025
Escrito en
2024/2025

PJM GENERATION DISPATCH EXAM 200 QUESTIONS & CORRECT ANSWERS LATEST 2025

Institución
PJM GENERATION DISPATCH
Grado
PJM GENERATION DISPATCH











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
PJM GENERATION DISPATCH
Grado
PJM GENERATION DISPATCH

Información del documento

Subido en
9 de julio de 2025
Número de páginas
70
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PJM GENERATION DISPATCH EXAM 200 QUESTIONS
& CORRECT ANSWERS LATEST 2025




Which of the following statements is correct concerning PJM assuming frequency
control of the restoration process?


A) PJM assumes control once an external transmission tie has been established.
B) Once an Area Control Error can be calculated, PJM will assume control.
C) Whenever it becomes too much of a burden for any one Transmission Owner
within the RTO
D) Whenever the Transmission Owners within the RTO agree to let PJM control
the process. - ANSWER-C) Whenever it becomes too much of a burden for any
one Transmission Owner within the RTO


During black start restoration, priority access to cranking power should be given
to:


A) Hot units that can return to service immediately.
B) Combustion turbines in areas where the initial disturbance occurred
C)Units with black start capability
D) Hydro Units - ANSWER-A) Hot units that can return to service immediately.


During a restoration, if you are presented with the opportunity to re-connect with
the Eastern Interconnection, you should:

,A)Not pursue this opportunity because you may cause the Eastern
Interconnection to become unstable.
B) Pursue this opportunity only when you have adequate Dynamic Reserves on
your system
C) Pursue this opportunity as quickly as possible
D) Pursue this opportunity only if you need cranking power for your generating
unity - ANSWER-C) Pursue this opportunity as quickly as possible


Complete (Total System) Blackouts are characterized by which of the following?


1 - Most common type of blackout
2 - May require coordinating multiple islands
3 - Likely to result in Transmission overloads or other issues
4 - Affects a very large geographical area, and many customers
5 - Most commonly caused by human or switching errors


A) 1 & 3
B) 2 & 4
C) 3 & 5
D) 1 - ANSWER-B) 2 & 4


The first step in a system restoration would be to:


A) Immediately notify the media of the event

,B) Restore as much of the area load as possible
C) Restore as much under-frequency load as possible
D) Verify that communication is functional with your neighbors - ANSWER-D)
Verify that communication is functional with your neighbors


Why would an offsite power to generating facilities be a priority during the
restoration process?


A) To provide safe shutdown power for the units
B) To meet FERC requirements
C) To provide adequate lighting for the plant operators to attempt a restart
D) To prepare and expedite the return of the unit - ANSWER-D) To prepare and
expedite the return of the unit


Factors that help determine the sequence of restoration of off-line generation
include (Pick 2):


-Generation Type
-Unloaded Capacity
-Unit Availability
-Stability of the Generator - ANSWER--Generation Type
-Unit Availability


How often should a Transmission company file an updated restoration report with
PJM?

, 1 - Every 30 minutes
2 - Every hour
3 - Every 10 lines that have been restored
4 - Every 5 lines that have been restored


A) 1 & 4
B) 2 & 3
C) 1 & 3
D) 2 & 4 - ANSWER-C) 1 & 3


Which of the following statements are true concerning delays in restoring
auxiliary power to off-line generation?


1 - The unit could suffer turbine shaft damage
2 - The fuel oil for the unit could congeal
3 - The startup time for the unit will be reduced
4 - The battery life used to maintain critical systems may run out


A) 1, 2 and 3
B) 1, 2 and 4
C) 1, 3 and 4
D) 2, 3 and 4 - ANSWER-B) 1, 2 and 4


During system restoration, the two categories of reserves are:
$22.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
NurseSue Johns Hopkins University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
49
Miembro desde
2 año
Número de seguidores
4
Documentos
1010
Última venta
4 semanas hace

3.9

8 reseñas

5
4
4
1
3
2
2
0
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes