Questions and CORRECT Answers
Save
Practice questions for this set
Learn 1 /7 Study with Learn
The length of the runway available for the ground landing run of an aircraft.
Choose matching term
1 VEF 2 Dissipating
3 TORA 4 LDA
Don't know?
Terms in this set (125)
, -Monitor the progress of each flight
-Issue any information regarding the safety of flight
Dispatch Responsibilities -Cancel or redispatch if in the opinion of he PIC or
Dispatcher the flight cannot continue safely as
planned or dispatched
The exercise of authority over initiating, conducting,
Operational Control
or terminating a flight
The angular difference between true and magnetic
Magnetic Variation
directions
Length of runway available for the ground run of
TORA
aircraft taking off.
The TORA plus the length of any associated stopway if
ASDA
provided.
The TORA plus the length of any associated Stopway
TODA
or Clearway if povided.
The length of the runway available for the ground
LDA
landing run of an aircraft.
The runway distance required to accelerate to V1,
Accelerate Stop Distance experience an engine failure at V1, and abort the
takeoff and bring the airplane to a stop.
The runway distance required to accelerate to V1,
Accelerate Go Distance experience an engine failure, at V1, and continue to
takeoff to cross 35' AGL at V2 ( takeoff safety speed)
Destination Alternate (123 C= 2,000 V= 3sm ETA +- 1 hour.
Rule)
Required when wx at the departure airport is below
Takeoff Alternate
landing minimums.
Extended operations more than 60 min from a
ETOPS suitable airport for 2 engine and 180 min for 3+
engines.