NERC PRACTICE EXAM QUESTIONS WITH CORRECT DETAILED ANSWERS | ALREADY GRADED A+RECENT VERSION 1. How much load reduction to change frequency - answer 6-10% Load reduction = 1HZ Frequency change same direction 2. Largest Load block to pick up during sys resto - answer 5% of online generation 3. Ratio of Voltage change to load change - answer 5% change in Voltage=3% change in load (distribution only) 4. Power Losses on Line - answer I squared * R 5. DOE Reporting Conditions - answer 300 MW uncontrolled loss of load 100MW Firm load shed 50,000 customers out of power greater than 1 hr 3% Voltage reduction Public appeals to reduce load vandalism, sabotage 6. Time requirements for DOT reporting - answer 60 minutes for initial report 48 hrs for followup report 7. NERC reporting time requirements - answer 24 hrs normal 72 hrs IROL violoation for intial 60 Days final report 8. How often must a black start gen be tested - answer every 5 years 9. How often must a sys resto plan be reviewed/updated - answer every 1 year 10. How often must sys resto plan be tested - answer every 3 years (really not sure about this one) 11. Who is responsible for creating a sys resto plan - answer TOP 12. how often is ACE calculated - answer every 6 seconds (have seen 4) 13. ratio of frequency change to load change - answer 1% change in frequency = 2% change in load (approx. depending on reactive nature of load) 14. transmission voltages - answer 765, 500, 345,230,138, 115 kv 15. distribution voltages - answer 240, 120, 4, 13, 26, 69 kv 16. how long does a gen have to restart after shutdown without full restart process - answer 30 minutes 17. allowable voltage variation during sys restoration - answer +/- 10% 18. allowable voltage variation during normal conditions - answer +/- 5% 19. allowable frequency variation during system resto - answer 59.75 hz - 61 hz (also saw 59.5 hz) 20. power transfer - answer ((V1*V2)*sin power angle)/Xsubl 21. What voltage is considered part of the BES - answer 100 kV or higher 22. Number of required emergency ops training hours for sys operators - answer 32 hrs 23. Formula for redispatching generation (only for balancing) - answer MW relief required/(GDF GenA-GDF GenB)=change in GenB output 24. Minimum Torque angle for power to start flowing - answer 10 degrees 25. Minimum Frequncy Bias setting for BA - answer 1% of estimated peak demand for next year or 1% of estimated peak generation for next year if not load serving 26. CPS1 requirement - answer greater than or equal to 100% for rolling 12 month period 27. CPS 2 requirement - answer greater than or equal to 90% for month (10 minute intervals) 28. What level of disturbance is reportable for DCS - answer 80% of MSST 29. DCS requirement to return to pre disturbance condition - answer 15 minutes 30. DCS requirement for recovery period - answer 90 minutes after the end of disturbance period 31. time error correction - answer 1) +/- .02 hz to Fs 2) 20% of B added to NIs if unable to perform frequency adjustment 32. amount of interchange transaction intermediate BAs receive for losses - answer 3% of transaction 33. how long does BA have to submit emergency RFI - answer 60 minutes 34. length of time deficient BA can use assistance from reserve sharing group before must sumbit RFI - answer 60 minutes 35. time Interchange Authority has to distribute arranged interchange - answer 1 minute

Mostrar más Leer menos
Institución
NERC
Grado
NERC

Vista previa del contenido

NERC
PRACTICE EXAM QUESTIONS
WITH CORRECT DETAILED
ANSWERS | ALREADY GRADED
A+<RECENT VERSION>



1. How much load reduction to change frequency - answer 6-10% Load
reduction = 1HZ Frequency change same direction


2. Largest Load block to pick up during sys resto - answer 5% of online
generation


3. Ratio of Voltage change to load change - answer 5% change in
Voltage=3% change in load (distribution only)


4. Power Losses on Line - answer I squared * R


5. DOE Reporting Conditions - answer 300 MW uncontrolled loss of
load
100MW Firm load shed
50,000 customers out of power greater than 1 hr
3% Voltage reduction
Public appeals to reduce load
vandalism, sabotage

,6. Time requirements for DOT reporting - answer 60 minutes for initial
report
48 hrs for followup report


7. NERC reporting time requirements - answer 24 hrs normal 72 hrs
IROL violoation for intial
60 Days final report


8. How often must a blackstart gen be tested - answer every 5 years


9. How often must a sys resto plan be reviewed/updated - answer every 1
year


10.How often must sys resto plan be tested - answer every 3 years (really
not sure about this one)


11.Who is responsible for creating a sys resto plan - answer TOP


12.how often is ACE calculated - answer every 6 seconds (have seen 4)


13.ratio of frequency change to load change - answer 1% change in
frequency = 2% change in load (approx. depending on reactive nature of
load)


14.transmission voltages - answer 765, 500, 345,230,138, 115 kv


15.distribution voltages - answer 240, 120, 4, 13, 26, 69 kv

,16.how long does a gen have to restart after shutdown without full restart
process - answer 30 minutes


17.allowable voltage variation during sys restoration - answer +/- 10%


18.allowable voltage variation during normal condtions - answer +/- 5%


19.allowable frequency variation during system resto - answer 59.75 hz -
61 hz (also saw 59.5 hz)


20.power transfer - answer ((V1*V2)*sin power angle)/Xsubl


21.What voltage is considered part of the BES - answer 100 kV or higher


22.Number of required emergency ops training hours for sys operators -
answer 32 hrs


23.Formula for redispatching generation (only for balancing) - answer
MW relief required/(GDF GenA-GDF GenB)=change in GenB output


24.Minimum Torque angle for power to start flowing - answer 10 degrees


25.Minimum Frequncy Bias setting for BA - answer 1% of estimated
peak demand for next year or 1% of estimated peak generation for next
year if not load serving


26.CPS1 requirement - answer greater than or equal to 100% for rolling
12 month period

, 27.CPS 2 requirement - answer greater than or equal to 90% for month
(10 minute intervals)


28.What level of disturbance is reportable for DCS - answer 80% of
MSST


29.DCS requirement to return to pre disturbance condition - answer 15
minutes


30.DCS requirement for recovery period - answer 90 minutes after the
end of disturbance period


31.time error correction - answer 1) +/- .02 hz to Fs
2) 20% of B added to NIs if unable to perform frequency adjustment


32.amount of interchange transaction intermediate BAs receive for losses -
answer 3% of transaction


33.how long does BA have to submit emergency RFI - answer 60
minutes


34.length of time deficient BA can use assistance from reserve sharing group
before must sumbit RFI - answer 60 minutes


35.time Interchange Authority has to distribute arranged interchange -
answer 1 minute

Escuela, estudio y materia

Institución
NERC
Grado
NERC

Información del documento

Subido en
5 de julio de 2025
Número de páginas
38
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$12.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
jervismuthami Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
10
Miembro desde
1 año
Número de seguidores
0
Documentos
573
Última venta
2 meses hace

4.5

2 reseñas

5
1
4
1
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes