Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

P-99 Low Pressure Boiler COF FDNY. 103 questions and answers

Puntuación
-
Vendido
-
Páginas
11
Grado
A+
Subido en
03-07-2025
Escrito en
2024/2025

P-99 Low Pressure Boiler COF FDNY. 103 questions and answers P-99 Low Pressure Boiler COF FDNY. 103 questions and answers P-99 Low Pressure Boiler COF FDNY. 103 questions and answers

Institución
P-99 Low Pressure Boiler COF FDNY
Grado
P-99 Low Pressure Boiler COF FDNY

Vista previa del contenido

P-99 Low Pressure Boiler COF FDNY
A fill line in an oil burner system is a line used to: ANS: Fill the storage tank with oil.



The aquastat is located ANS: Below the water line.



All heating, combustion, and cooking equipment shall be installed with adequate clearances from
_______ construction. ANS: Combustible



The equipment must be provided with ______ or the building construction shall be _____ _____. ANS:
Insulation.

Fire Protected



During operation the surface of combustible construction materials will not be raised to a temp higher
than _____ degrees F. ANS: 170 degrees



Equipment shall be so that the means of access for ordinary operation and maintenance will not be
_______. ANS: Hazardous



Acceptance Tests:

Boilers shall not be placed in operation until they have been _____ and ____ and an equipment ____
_____ has been issued by the ______. ANS: Inspected and tested.

Use permit, commissioner



Periodic Inspections: All boilers must be inspected at least _____ a _____ including chimney
connections. ANS: Once a year



Owners Annual Statement: The owner of each boiler shall file an _____ written statement with the
________, specifying the _____of each boiler and ______ for inspection. ANS: Annual, commissioner,
location, arrangement.

, Field Tests: all piping and oil storage tanks shall be _______ tested for tightness by the ______ before
the system is operated. ANS: Hydrostatically, contractor



The piping shall be tested at _____ times the max working pressure applicable to that part of the piping
system but at a pressure ____ than the test pressure required for the storage tank. ANS: 1/2, less



The min pressure for testing tanks shall be ____ times the max working pressure but in no case less than
____ psi. ANS: 1 1/2, 25 psi



The hydrostatic pressure must be maintained until all ____ and _____ have been visually inspected for
___, but in no case less than _____ hour. ANS: Joints, connections, leaks, 1/2 hour.



A record must be kept of the pressure test showing the name of the _____ and the _____ at which the
piping and tank were tested. ANS: Contractor, pressure



Gas piping must be tested by the _____ before operation. ANS: Contractor



For oil burning systems, ____ ____ giving instructions for the care and operation of the system shall be
permanently located in an easily _____ and _____ location near the equipment. ANS: Instruction Cards,
visible, accessible



No oil burning equipment shall be operated until an equipment ____ _____ has been issued by the
commissioner, the requirements of the ____ ____ control code have been met and until the approval
for the storage of ____ ____ has been given by the fire commissioner. ANS: Use permit, air pollution,
fuel oil



Every oil burning installation that is not fully automatic or requires preheating shall be operated under
the direct supervision of a person holding a ____ ___ ______ issued by the FD. ANS: COF

Escuela, estudio y materia

Institución
P-99 Low Pressure Boiler COF FDNY
Grado
P-99 Low Pressure Boiler COF FDNY

Información del documento

Subido en
3 de julio de 2025
Número de páginas
11
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$13.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
lectjoseph Harvard University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
80
Miembro desde
3 año
Número de seguidores
23
Documentos
5500
Última venta
4 días hace

learning is hard ,but with me it will be easier. Timely ,detailed and organized study guides and notes that will save you a lot of study time. Reviews are highly appreciated. Wishing you the best

3.5

10 reseñas

5
4
4
1
3
2
2
2
1
1

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes