ANSWERS UPDATED 2025 - 2026
What,Component,of,LMP,is,the,same,for,every,bus,in,the,PJM,RTO?,,ANS,-,System,Energy,Price
What,control,signal,is,measured,in,MWs?,,ANS,-,Economic,basepoint
Which,of,the,following,are,the,two,Ancillary,Service,Markets,that,PJM,operates?,,ANS,-
,Regulation,and,Synchronized,Reserve,markets
Who,regulates,PJM?,,ANS,-,Federal,Energy,Regulatory,Commission,(FERC)
A,Geomagnetic,Disturbance,Warning,issued,by,PJM,when,the,NOAA,has,issued,a,warning,or,an,alert,for,
a,potential,GMD,storm,of,what,severity?,,ANS,-,K7
During,an,Environmental,Emergency,Act,Emergency,,which,entity,must,submit,for,the,request,for,varian
ce,to,the,appropriate,government,agency?,,ANS,-,The,Generation,Owner
Warning,issued,when,synch,reserve,requirements,are,less,than,synch,reserve,requirement,,ANS,-
,Voltage,reduction,warning,and,Reduction,of,of,Non-critical,plant,load.
The,purpose,of,the,Heavy,Load,Voltage,Schedule,Warning,is,to,have,members,prepare,for,maximum,su
pport,of,voltages,on,the,:,,ANS,-,Bulk,Power,System
During,a,suspected,terrorism,or,sabotage,event,,PJM,puts,emphasis,on,what,aspects,of,operation?,,ANS
,-,Operation,and,Communication
PJM,can,issue,Emergency,Procedures,in,any,order,to,keep,reliable,operations,in,the,RTO.,The,normal,se
quence,of,issuing,Deploy,All,Resources,is,after:,,ANS,-
,issued,prior,but,no,later,than,the,same,time,as,a,Voltage,Reduction,Action