Six Dials of Project Scope - ANS -cost
-time
-quality
-safety
-scope
-function
Three-legged-stool - ANS -time
-cost
-quality
Design-bid-build - ANS Traditional project delivery method
-owner holds two separate contracts for design and build
Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 1
, Agency CM - ANS Cons. Manager acts on the owners best interest but is not financially
responsible
GMP - ANS Guaranteed Maximum Price
Multiple Prime - ANS Contracting method where the owner bypasses a General Contractor
and enters into multiple contracts with contractors
Design-build - ANS Newer delivery method where there is only 1 contract between the
owner and Design/Builder. Design/Builder is responsible for both ends.
Fast-tracking - ANS a practice utilized to speed up job by overlapping the design and
construction phrase.
IPD - ANS Integrated Project Delivery